Split bill of lading

Use Split when part of a planned shipment needs its own bill of lading. Enter the package quantities that should remain on the original shipment. The remainder becomes one new shipment linked to the original and the same sales order.

If the receiving shipment already exists, use Adjust shipment to move quantities between the existing records.

Prepare the split​

Open Shipping → Operations → Shipments and identify the saved bill of lading you want to divide. Split is offered for Scheduled, Awaiting Stock, and Stock Available shipments.

Check the sales order, customer, warehouse, destination, shipment date, and each product's package count. Decide how many packages to keep on this shipment and how many belong on the new shipment. Read Packaging and Unit of Measure together so that you distinguish packages from the product units inside them.

Settle the split before invoicing and dispatch. Review any existing invoice reference and shipped or invoiced quantities before changing the load; splitting does not correct an existing invoice or reverse a dispatch.

The action changes planned shipment documents. It does not post a warehouse stock movement, reserve stock, or dispatch either shipment. Recheck stock readiness separately for the resulting quantities.

Choose the quantities to keep​

The split panel's Quantity to ship is a package count retained on the original bill of lading. The new shipment receives the difference between the original package count and the count you enter.

Your intention for a lineQuantity to ship
Keep all its packages on the original.Leave the original package count. That line contributes no remainder to the new shipment.
Divide its packages between the two shipments.Enter the smaller package count to retain on the original. The new shipment receives the rest.
Put all its packages on the new shipment.Enter zero, then check both saved shipment records before continuing.

Keep each entered value nonnegative and no higher than the original package count. At least one line must leave a positive remainder for the new shipment; otherwise there is nothing to split.

For example, assume a line contains 10 cartons and you want six cartons on the original shipment and four on a new shipment. Enter six, rather than four, in Quantity to ship. After the split, compare six plus four with the original 10 cartons. These are illustrative counts, not packaging defaults.

Split the shipment​

  1. On Shipments, find the original bill of lading and choose Split. The Split Shipment into Multiple Shipments panel opens.
  2. Review Key shipment information, including Sales order, Status, Customer PO, and Shipment date of departure. Confirm that you are dividing the intended shipment.
  3. Under Item to ship, review each Product, Packaging, and Unit of Measure. Compare the current shipment's saved package counts with Total Quantity, which provides the original package comparison in the split form.
  4. Enter the packages to keep on the original in Quantity to ship. Review the displayed Quantity as product units after recalculation. Keep the other lines at their original package counts when they should remain entirely on the original shipment.
  5. Check that your intended original and new counts add back to the starting package counts, and that at least one line has a positive remainder. Review any product, variant, packaging, or quantity message before proceeding.
  6. Choose Split shipment.

The action recalculates the original and the new bill of lading before saving them. A successful split creates one child shipment for the remainder. The panel title does not mean one submission creates a separate shipment for every product line.

Check the original and new shipment​

Return to Shipments and inspect both saved bills of lading. Keep their numbers together when reviewing the order's remaining shipping work.

  • The original contains the package counts you chose to keep.
  • The new shipment contains each positive remainder for the correct product and packaging.
  • For every divided line, the original and new package counts add back to the count before the split.
  • Product quantities and weight agree with the resulting packages and their units. The bill of lading explains those calculations.
  • The new shipment is Scheduled, with the intended sales order, customer, warehouse, destination, provider, and shipment date.

The new bill retains a relationship to the original. It starts with the copied shipment date and provider details, so review its departure arrangements before treating it as a separately prepared load. Use Ship in full to review and save departure details when those arrangements need preparation.

Check inventory readiness, billing, and pickup requirements for each resulting shipment through the Shipments workflow. Creating the child bill does not establish that either load is ready to leave stock.

Resolve a blocked or uncertain split​

What you seeWhat to check and do
Split is not offered on the row.Check the shipment's status and that you selected the intended record. The action is offered for Scheduled, Awaiting Stock, and Stock Available.
A message says a quantity exceeds the original.Reduce Quantity to ship to the package count you intend to keep, within the saved original count. Recheck which quantity stays and which becomes the remainder.
A message says no lines are selected to split.At least one line needs a positive remainder. Reduce that line's retained package count when a new shipment is intended.
A product, variant, or packaging cannot be found.Have the referenced product or packaging information corrected, then reopen the split and review its lines. The split needs the packaging definition to calculate quantities.
The original record or a matching line cannot be found.Reopen the correct saved bill of lading and load its current lines before trying again.
The split reports an error or the new bill is not immediately clear.Inspect the saved original and look for a child shipment on the same order before retrying. Check their actual counts first; an error alone does not establish that the original stayed unchanged.

FAQ​

Business questions​

When should I split a bill of lading?​

Use Split when part of a planned shipment needs a new bill of lading before dispatch. If you want to transfer packages to a shipment that already exists, use Adjust instead.

How is the new shipment connected to the order?​

The new bill of lading keeps the same sales order and a relationship to the original bill. Compare both saved shipments and retain their bill of lading numbers when reviewing the order's shipping plan.

Does splitting a bill of lading ship or reserve the goods?​

No. It updates the planned shipment quantities and creates a Scheduled child shipment. Check stock readiness and complete the separate shipping and billing work for each resulting load.

Technical questions​

Is Quantity to ship the amount moved to the new shipment?​

It is the package count kept on the original. The new shipment receives the remainder. For a starting count of 10 cartons, entering six leaves six on the original and creates a four-carton remainder.

Why does the split say no lines are selected?​

There is no positive remainder for a new shipment. If every line keeps its full original package count, nothing moves to the child. Reduce the retained count on the line you intend to divide, then recheck the result.

What should I do when a retained quantity exceeds the original?​

Enter a nonnegative package count no higher than that line's saved original count. Check the packaging and units, then recalculate your intended retained and remainder counts before selecting Split shipment.