Raw material inspection
A raw material inspection records the checks and quantity decision for incoming material. Use it to connect a supplier's delivery with its purchase order, lot, test results, and inventory movement before the material enters production consumption.
Open Quality Control → Inspections → Raw Material Inspections. The inspection number uses the RIS prefix. Choose View inspection log to read the record, its activity, and its attachments.
Identify the material and delivery
Read the product, vendor, purchase order, warehouse, and lot together. They answer different questions: what arrived, who supplied it, which order it belongs to, where it is held, and which batch you tested. The purchase order number in the table opens the related purchase order so you can compare the inspection with the ordered material.
Use Lot Number for the supplier's or assigned batch identifier. Rail Cart Number identifies the delivery container when rail delivery applies. Compartment tested records where the sample came from; Silo unloaded to records the destination silo or storage area. These details help you distinguish samples and deliveries that share a product name.
Date Received records physical receipt. Date Tested records the inspection date. Tested and released by identifies the responsible person. The record also shows who created or last updated it; these administrative details serve a different purpose from naming the person who performed the test.
Read the test evidence
The test fields pair an expected value with the measured result. Compare each pair using the specification and test method applicable to the material.
| Test | Given value | Test value |
|---|---|---|
| Melt | Expected melt flow index, in g/10 min | Measured melt flow index |
| Density | Expected resin density, in g/cm³ | Measured density |
| Ash | Declared ash percentage | Measured ash percentage |
Select the relevant Resin type when recording the tests. Its configuration can identify fields that must be populated for a pass decision. A populated field is a readiness check; it does not by itself establish that the measurement meets your acceptance criteria.
Use Instructions for testing methods or handling requirements, Comments for observations, and attachments for supporting files. Read these beside the numerical results so a later reviewer can understand the decision. A difference between a given and tested value needs the applicable specification and your QC judgment; this record does not supply a universal acceptable variance.
Interpret the status and outcome
The status describes the inspection's progress. It is not a separate pass or fail verdict.
| Status | What it tells you |
|---|---|
| Draft | The inspection has been created and has not started. |
| Open | The inspection has started. A remainder or replacement inspection also starts here. |
| In Progress | Inspection information is being recorded. |
| Review | The record is marked as awaiting review. |
| Completed | A pass or fail decision has been recorded for the processed quantity. |
| Reversed | The original inspection has been reversed, with a replacement inspection created for another inspection. |
Both Inspection Passed and Inspection Failed can finish the record as Completed. Check the inspected quantity, inspection activity, failure information where present, and the related inventory movement before handing material to the next team. Completed alone does not establish that the material passed or is in the normal stock location.
The raw material action menu offers Inspection Passed and Inspection Failed while the record is Draft, Open, or In Progress. Set to In Progress is available from Draft. Use the current record and its available actions to determine the next step.
Reconcile a partial inspection
Keep the scope of each quantity clear. Total quantity in inspection describes the quantity assigned to that inspection. Inspected quantity shows the quantity processed by its decision. Quantity received appears in the inspection table; after a split, the new record carries the remaining quantity rather than the original delivery quantity.
When you pass or fail less than the total quantity in the inspection, the system creates another inspection for the remainder. It marks the decided record Completed, sets its inspected quantity to the quantity processed, and gives the new record an Open status with zero inspected quantity. The new record references the original inspection, preserving the connection between the decisions.
For example, assume an inspection covers 1,000 kg and you pass 600 kg. The completed record shows 600 kg inspected. The new Open inspection covers 400 kg, because 1,000 − 600 = 400. Its inspected quantity starts at 0 kg. The same remainder principle applies to a partial failure. These figures illustrate the calculation; they are not a sampling recommendation.
Check that the decided quantity plus the remainder reconciles to the quantity before the decision, in the same unit of measure. Do not add the Quantity received values from the original and child records as though they represented separate deliveries. Check the purchase order and goods receipt when reconciling the full delivery.
Understand what a decision changes
Inspection Passed completes the inspection for the selected quantity and creates an inventory movement from the warehouse's quality assurance location to its stock location. The action also requests completion of that movement. Check the resulting movement and stock before arranging production consumption.
A pass requires a lot number and a valid tester. When a resin type is selected, fields required by that resin configuration must be present and nonzero. The pass action also checks lot uniqueness; a linked child inspection has an exception to the duplicate-lot check. Record the actual lot and measurements, and resolve a validation error against the source information rather than entering substitute values to proceed.
Inspection Failed completes the record for the selected quantity and creates an inventory movement out of the quality assurance location. The failure form requires a failure type. Scrap is the listed failure choice. Check the resulting movement's actual destination and arrange the physical handling with the warehouse team; the choice's label alone is not proof that the material has been physically scrapped.
If only part of the material was decided, continue with its new Open inspection. The completed parent is the history of the quantity already decided.
Check the record before a handoff or correction
Before passing or failing material, compare the product, purchase order, warehouse, lot, and unit of measure with the material being tested. Confirm the test date, responsible person, measurements, and supporting observations. Check that the decision quantity describes the material covered by this decision and that any remainder remains accounted for.
After saving, reopen the record and check the status and inspected quantity. For a partial decision, find the new Open inspection and compare its quantity with the expected remainder. Then check the inventory movement and destination with the receiving or warehouse team. If an action reports an error, review the current inspection, any new remainder record, and the movement before retrying, so you know what was saved.
Use Update to maintain the inspection's recorded information. Use Reverse when a completed decision needs to be undone. Reversal requires exactly one inventory movement linked to the inspection and a warehouse with stock and quality assurance locations configured. It reverses the linked movement, creates a new Open inspection with the quantity and product context, and records the original as Reversed with the reversal date and person. The confirmation warns that reversal can fail if the stock is no longer at the location. Check stock availability before relying on this correction.
FAQ
Business questions
Does Completed mean the raw material passed?
No. Passing and failing both set the inspection to Completed for the quantity processed. Read the inspection activity and outcome information, and check the related inventory movement before treating the material as available stock.
Why can one delivery have more than one inspection?
A partial pass or failure creates an Open inspection for the remaining quantity. The new inspection references the original, so you can trace the separate decisions without treating the remainder as another delivery.
What should the warehouse check after an inspection fails?
Check the decided quantity and the resulting inventory movement's destination before physically handling the material. The failure action moves material out of quality assurance, and a failure label such as Scrap does not establish that physical scrapping has occurred.
Technical questions
What is the difference between the given and test values?
Given values hold the expected melt flow index, density, and ash percentage; test values hold your measured results. Compare each pair using the applicable material specification. Recording a value does not establish an acceptance threshold.
Why can a pass be blocked after I record the test results?
The pass action also checks for a lot number, a valid tester, and duplicate lot assignment. If you selected a resin type, its required inspection fields must be populated and nonzero. Review the reported condition against the inspection and resin configuration before retrying.
What should I find after reversing a completed inspection?
The original should be Reversed with the reversal date and person, and a new Open inspection should cover the quantity for another inspection. Check the reversed inventory movement too. Reversal requires exactly one linked movement and can fail when the stock is no longer at its location.