Skip to main content

Raw material control point

A raw material control point defines an incoming inspection check: which materials it covers, the inspection method, the control frequency, and the notes the team needs. Use it to keep a reusable definition of the check separate from the results of a particular delivery.

Open Quality Control → Configuration → QC Points - Raw Materials. The list shows QC Point, Status, Control Frequency, and Inspection Type. Choose Update to read the material rows and notes as well.

Check which materials the point covers​

Read QC Point Name with the Material rows. The name helps you recognize the check; the selected material records define its listed scope. A descriptive name such as “Incoming filler visual check” is more useful than a label that could describe several unrelated checks.

Each row selects a material. You can add multiple materials when the same control applies to them, using Add additional material. Review each selection against the intended receiving work rather than relying on the name alone. A name mentioning a material does not add that material to the rows.

For example, if the same visual check applies to two filler materials, list both materials under one point. If a different material needs a different method or frequency, review whether it needs a separate definition. This example explains how to read scope; it does not prescribe an inspection policy or imply that an empty material list covers everything.

Interpret the inspection method​

Inspection Type names the kind of check. Choose the method agreed for the listed materials, then use the applicable specification and instructions to carry it out.

MethodWhat the choice describes
VisualVisible defects, color, or packaging.
MeasurementA measured reading compared with a specification.
DimensionalDimensions checked with measuring equipment.
WeightWeight checked against a specification.
VoltageA voltage reading.
ElectricalElectrical properties such as current, resistance, or conductivity.
ChemicalComposition, purity, pH, or contamination.
ThermalProperties such as heat resistance or melting point.
MicroscopicSurface, structure, or defects examined under magnification.
Functional TestingPerformance for the intended use.
Non-Destructive TestingInspection without damaging the material.

The method is a classification of the work. It does not supply a numerical acceptance limit, a test result, or a pass/fail decision. Make the requirement and test method clear in the instructions used by your QC team before relying on the point for receiving work.

Read frequency with the operating instructions​

Control Frequency describes how often the check should be performed. Read it with Notes and the agreed procedure so the receiving team understands the work expected.

FrequencyMeaning
Inspect All UnitsEvery unit is inspected.
Random SamplingSampling without a fixed schedule.
Periodic ChecksChecks at fixed time intervals.

The record provides these frequency choices; its form does not specify a sample size, sampling percentage, or interval length. For Random Sampling, confirm the applicable sampling instructions. For Periodic Checks, confirm the actual interval with the responsible QC team. Selecting a label is not enough to tell an inspector how many units to sample or when the next check is due.

Use Notes for context that helps the next person apply the definition, such as where to find the agreed test instructions or a handling consideration. Keep those notes consistent with the selected materials, method, and frequency.

Check the status separately from the definition​

The control point has Active and Inactive states. Read the current Status on the list rather than assuming a newly saved point has the intended state.

Deactivate is available on an Active point and changes it to Inactive. reactivate is available on an Inactive point and changes it to Active. Check the resulting status after either action. The method, materials, and notes remain information to review separately from that status choice.

Active describes this configuration record. Check the relevant inspection when you need to know whether a delivery has been tested or accepted. A change to the point's status is not an inspection result.

Follow the definition into inspection work​

A raw material inspection can reference its raw material control point. The point provides the definition to trace; the inspection records the delivery, lot, test evidence, quantities, and decision. Use that distinction when investigating why a check was expected and what happened for the material received.

When reviewing an inspection, compare its material with the point's listed materials, then compare the expected method and frequency with the work recorded. Resolve a mismatch with the responsible QC team before relying on the result. Saving a definition does not establish that a particular inspection has been created, performed, or completed.

Maintain and verify the record​

Use Create raw material control point for a distinct definition. Use Update raw material control point when the existing check needs a change to its name, materials, method, frequency, or notes.

Before saving, compare all selected materials with the intended scope. Check that the method and frequency describe the same agreed check and that the notes explain any operational detail the labels leave open. After saving, reopen the same point with Update and compare those values again. Then check Status on the list.

If the concern is about test readings or a delivery's decision, review the inspection record. Keep changes to the reusable definition distinct from corrections to the evidence of an inspection already performed.

FAQ​

Business questions​

How does a control point differ from a raw material inspection?​

The control point defines the materials, method, frequency, and notes for a reusable check. The inspection records what happened for particular material received, including its lot, readings, quantities, and decision. Use the inspection's control-point reference to trace the definition associated with that work.

Can one control point cover more than one material?​

Yes. Add a Material row for each material covered by the same check. Review the selected records together with the method and frequency; the point's name alone does not establish its material scope.

When should I create another point rather than update this one?​

Create a point when you need a distinct inspection definition. Update the existing point when you intend to change that check's scope, method, frequency, or notes. Review the current definition first so the change describes the work you intend.

Technical questions​

What do the Control Frequency choices mean?​

Inspect All Units covers every unit. Random Sampling describes sampling without a fixed schedule. Periodic Checks describes checks at fixed time intervals. The form does not set a sample size or interval length, so confirm those operational details in the applicable QC instructions.

Does Inspection Type define the acceptance limits?​

It identifies the method, such as Visual, Measurement, or Chemical. It does not provide numerical tolerances or record a result. Use the applicable material specification and testing instructions to assess the actual inspection evidence.

How do I check whether the point is Active or Inactive?​

Read Status on QC Points - Raw Materials. An Active point offers Deactivate; an Inactive point offers reactivate. After using the action, verify the new status and review the saved definition separately.