Nonconformance Reports
Use nonconformance reports to carry a production issue from identification through investigation, planned and implemented corrective work, disposition, and recorded closure. An NCR is the issue record; it does not replace the inspection result or the stock movement.
Open Quality Control → Nonconformance & Compliance → Nonconformance Reports.
Establish the issue and responsibility
Start with the affected inspection and goods, the issue description and category, originating and responsible sites, and responsible people. Create nonconformance report records this context with the investigation stages.
Selecting a finished-goods inspection can fill context and quantities. Compare those values with the affected goods, especially after changing the inspection. Filled values are starting information to verify, not a final acceptance or disposal decision.
Keep the plan separate from the work done
Use Update nonconformance report as the root cause and corrective work become known. Planned actions record what should happen, the target dates, and assignees. Implemented actions record what happened, when, and who completed it.
Read accepted and scrap quantities with the final disposition and its details. The NCR record explanation explains the issue, action, disposition, and CPAR information. CPAR records the corrective/preventive action request requirement and reference; check that work separately where applicable.
Close and verify the issue
Review the actual corrective work and disposition before using Close nonconformance report. Confirm issue closure is offered for Open reports and records closure comments, person, and date while setting Closed.
Check the Closed report with its closure information. Check the inspection, physical stock handling, production work, and CPAR independently before treating the issue as ready for the next team. Closure is a report-state change, not proof that all connected work was automatically completed.
FAQ
Business questions
How is an NCR different from a failed inspection?
The inspection records the production check and quantity decision. The NCR carries issue responsibility, investigation, corrective actions, disposition, and closure.
Why distinguish planned actions from implemented actions?
The plan records intended work, dates, and assignees. Implemented actions record what happened and who completed it, so a plan is not mistaken for finished corrective work.
What does closing an NCR establish?
It records the closure decision and sets the report Closed. Related inspections, stock handling, production, and CPAR must be checked separately.
Technical questions
What should I verify when selecting an inspection?
Check the product, affected quantities, sites, production context, and issue identity after the form fills values from the selected inspection.
Which action maintains the investigation?
Update lets you record the cause, planned and implemented actions, quantities, disposition, attachments, and CPAR reference.
How do I check closure?
Find the Closed report and compare closure comments, Closed by, and Date of issue closure with the decision you intended to record.