Pass raw material inspection
Register the quantity of incoming material that has passed its inspection. This action completes that quantity's inspection and starts the movement from quality control to the warehouse stock location. A partial pass leaves the remainder on a new Open inspection.
Open Quality Control → Inspections → Raw material. Inspection Passed is offered for Draft, Open, and In Progress inspections.
Check readiness before accepting stock
Use Update raw material inspection to check the lot, valid tester, selected resin, and actual readings. The pass action requires a lot and valid tester. When a resin is selected, its configured required readings must be present and nonzero. A nonzero reading is not a substitute for checking your material specification.
Confirm the purchase order and warehouse are correct and that the warehouse has the quality-control and stock locations used for the movement. A previously used lot number can be rejected; a linked child inspection from an earlier partial decision can reuse the parent's lot.
Register the accepted quantity
- On the intended inspection, select Inspection Passed.
- In Register a passed inspection, compare Purchase order number, Product, Unit of Measure, and Total Quantity with the material you tested.
- Set Inspected quantity to the quantity that passed. Check it against the quantity on this inspection, rather than the original shipment total. Review Lot Number, Rail Cart Number, and instruction.
- Select Register pass.
Verify both the inspection and stock result
Find the original inspection and check that its status is Completed and its inspected quantity matches the accepted quantity. For a partial pass, find the new Open inspection for the remaining material and compare its quantity with the uninspected remainder. For example, an illustrative total of 100 kg with 60 kg passed leaves 40 kg to inspect.
Check the associated inventory movement and resulting stock location before handing the material to production. Completed alone is not enough: the inspection update and inventory movement are separate effects. If an error appears, inspect both records before repeating the decision.
If the pass is rejected for a missing tester, lot, or required reading, correct the actual evidence through Update and recheck it before retrying. Do not enter a fabricated measurement to bypass the check.
FAQ
Business questions
Can I pass only part of the received material?
Yes. Enter the accepted quantity for this inspection. A partial pass creates an Open child inspection for the remainder.
What happens to the accepted material?
Pass processing completes the selected inspection quantity and creates and completes a movement from the warehouse quality-control location to its stock location. Check the movement result before handing stock to production.
Does Completed always mean a raw-material inspection passed?
No. Failure processing can also mark an inspection Completed. Read the decision context and associated stock movement as well as the status.
Technical questions
Why can a pass be rejected for test data?
A lot and valid tester are required. When a resin is selected, every configured required field must be present and nonzero.
Why might a lot number be rejected?
The pass checks for an existing identified-stock serial number. A duplicate is rejected for an inspection without a parent; linked partial-inspection children are allowed to reuse the lot.
What should I check after an error?
Check the original inspection, any Open remainder inspection, and the associated inventory movement before retrying. The inspection state alone does not prove the stock movement completed.