Skip to main content

Update in-process inspection

Update an in-process inspection's classification, control-point selection, and review evidence. This records the check within production; saving this form is separate from an inspection pass/fail decision.

Open Quality Control → Inspections → In Process.

Prepare the check and review evidence​

Have the agreed Inspection Type and Control Point ready. A control point describes the required checks and work-instruction context. Select the point for the work being inspected, rather than selecting a similarly named finished-goods or raw-material point.

Use Outcome & Review to record Failure Type, Reviewed By, and Reviewed on when those details apply. The failure choices are Scrap and Rework; record the observed classification rather than treating the selection as proof that stock has moved or rework has been completed.

Update the record​

  1. Find the inspection for the correct production work and select Update. Check its existing context before replacing values.
  2. On Job Details, choose Inspection Type and Control Point.
  3. On Outcome & Review, record the applicable failure and review details.
  4. Add supporting files on attachments and explain the findings in Comments on Notes.
  5. Select Update Inspection.

Check what was saved​

Find the inspection in In Process and reopen Update. Compare the type, control point, reviewer, review date, attachments, and notes with the intended check. Use Inspection details to check the record's production context when present.

Check the inspection state separately from the reviewer fields. Saving a reviewer's name is not the same action as recording a pass or fail, and it does not establish that production stock is available for use.

FAQ​

Business questions​

When should I update an in-process inspection?​

Update an existing inspection when its classification, control point, review evidence, attachments, or notes need to be recorded or corrected.

Which control point should I select?​

Select the in-process point that describes the work being inspected. It provides the check and work-instruction context; the form also lets you choose Inspection Type.

Does saving review information pass the inspection?​

Saving records the selected reviewer and review date with the inspection details. A pass/fail decision is a separate action.

Technical questions​

Which outcome fields can I record?​

Outcome & Review includes Failure Type, Reviewed By, and Reviewed on. Failure Type offers Scrap and Rework.

Where do supporting files and explanations go?​

Add supporting files on attachments and enter Comments on Notes so the findings can be read with the inspection.

How do I verify the saved entry?​

Reopen Update from In Process and compare the type, control point, review details, attachments, and notes. Use Inspection details to check the production context where present.