Skip to main content

Update finished goods inspection

Record or correct the test evidence for a finished-goods inspection before its quantity decision. Updating measurements saves inspection data; pass, fail, and potential-nonconformance review are separate actions.

Open Quality Control → Inspections → Finished Goods. The row's Update action is offered for Draft, In Progress, Open, and In Review inspections.

Prepare the production and test evidence​

On Test Basics, check Resin type, Manufacture date, Date Testing Completed, Ash Tester, Final Product Tester, and Sample time (mins). Read the consumed-material rows by Product, Identified Stock Number, and Quantity to match the test to the production material.

On Test results, record the actual measurements in the displayed units: melt flow in g/10m, density in g/cc, diameters and wall thickness in inches, and tensile and burst pressure in psi. The form also includes carbon black, ovality, out of round, time to burst in seconds, and the Reverse Bend result. Use the approved specification when interpreting them.

Save the measurements​

  1. Find the intended production inspection and select Update.
  2. Check the production, resin, tester, dates, and consumed-material context on Test Basics.
  3. Enter the actual readings on Test results. Keep minimum and maximum wall readings distinct and choose the observed Reverse Bend result.
  4. Add supporting files and Comments on Comments and Attachments.
  5. Select Update record.

Verify before the next decision​

Reopen Update on the same inspection. Compare the resin, testers, dates, material identities, measurements, and units with the test evidence. Use this form to check the separate minimum and maximum wall readings.

Check status separately from the saved measurements. If the record is awaiting review, use Submit inspection review. Otherwise, use the appropriate pass or fail decision when the tested quantity and evidence are ready.

FAQ​

Business questions​

When should I update a finished-goods inspection?​

Update it when production test details, resin, tester information, readings, attachments, or comments need to be recorded or corrected.

Does saving measurements release the finished goods?​

Updating saves the test record. Pass and fail actions make separate quantity decisions and can affect stock and follow-up work.

Why check consumed-material identity?​

The Test Basics rows identify the products, stock numbers, and quantities used. Match them to the production being tested so the readings refer to the intended material.

Technical questions​

Which units should I use?​

Use the labels in Test results: dimensions in inches, density in g/cc, melt flow in g/10m, tensile/burst pressure in psi, and time to burst in seconds.

Are minimum and maximum wall thickness separate readings?​

Yes. Enter and verify them separately in Update; do not substitute a single wall value for both.

How do I verify the saved test evidence?​

Reopen Update and compare the resin, dates, testers, consumed-material identities, readings, and units with your source evidence. Check inspection status separately.