Submit inspection review
Record the assessment of a finished-goods inspection awaiting potential-nonconformance review. Submitting the review marks the inspection Reviewed and records who reviewed it and when. It is a separate stage from accepting or failing a quantity.
Open Quality Control → Inspections → Finished Goods. Review is offered for inspections in In Review.
Prepare a useful review
Read the inspection's production context and test measurements before deciding what to record. Use Update to check the saved readings when needed. Prepare an Inspection review of at least 20 characters that explains the findings and the basis for the next decision.
Submit the review
- On the intended inspection, select Review.
- In Review of Potential Nonconformance, enter Inspection review. Describe the actual findings; the length check does not determine whether the assessment is correct.
- Select Submit review.
Check the reviewed state
Find the inspection and check that its status is Reviewed. Review submission records the current person as reviewer and the submission time as review date. Check those record details with the assessment before passing the work onward.
A review does not move stock or record a pass/fail quantity. Before a later pass or fail decision, reconcile the current quantities and any Open remainder with the tested goods, then check the findings with the quality owner.
If submission reports that the description is missing or too short, enter a substantive review of at least 20 characters and try again. If the inspection cannot be found, recheck the selected record before submitting.
FAQ
Business questions
When do I submit an inspection review?
Use Review when the finished-goods inspection is in In Review and needs a recorded assessment of potential nonconformance.
Does Reviewed mean the inspected quantity passed?
Reviewed records the assessment stage. Pass and fail remain separate decisions for the inspected quantity.
Does submitting a review move stock?
The review action updates the review description, reviewer, review date, and status. The pass/fail decision is the separate stock-related stage.
Technical questions
How long must the review be?
Inspection review must contain at least 20 characters. Explain the actual findings and the basis for the next decision.
Who is recorded as the reviewer?
The action records the current person as reviewer and stamps the submission time as the review date.
How do I recognize a successful review?
The inspection changes to Reviewed. Check its reviewer and review date with the recorded assessment before continuing to a quantity decision.