Skip to main content

Fail finished goods inspection

Record the packaging quantity of finished goods that failed inspection and choose its disposition. This decision can move stock and create follow-up production work, so review the failure type and instructions before submitting.

Open Quality Control → Inspections → Finished Goods. Inspection Failed is offered for In Progress, Open, and Reviewed inspections.

Choose the failed quantity and disposition​

Match the manufacturing order, product, lot, and packaging to the tested goods. Although the form calls the input Inspected quantity, this decision uses a package count and converts it to the item's unit quantity using the configured quantity per package. Read the packaging and both totals together.

Failure Type offers Rework and Scrap. Rework routes the failed stock to the warehouse rework location and creates an Open rework manufacturing order; provide instructions describing the work needed. Scrap routes it to the warehouse scrap-hold location and creates a Draft replacement manufacturing order. These are follow-up records, not proof that rework, disposal, or replacement production is finished.

The warehouse needs the location setup used by failure processing, including the configured scrap location. Rework also requires its rework location, while the Scrap path uses scrap hold. Check the location setup with the warehouse team before committing a decision that cannot complete its stock movement.

Register the failure​

  1. Select Inspection Failed on the intended inspection.
  2. In Register a failed inspection, check Manufacturing order, Lot Number, Product, the packaging, and totals.
  3. Choose Failure Type and enter the tested package count in Inspected quantity.
  4. Enter the instruction for the disposition. Rework requires instructions; explain what the next team must do. Add Comments where needed.
  5. Select Register partial fail.

Verify the disposition and follow-up work​

Check that the original inspection is Completed with the intended failed quantities and failure classification. For a partial failure, find the new Open inspection for the remainder and compare its quantity with the uninspected goods.

Check the inventory movement's destination and completion, then check the follow-up manufacturing order: Open rework for Rework, or Draft replacement for Scrap. A Completed inspection alone does not prove the stock movement or follow-up order succeeded. If the action reports an error, inspect these records before retrying.

Record the issue investigation separately through Nonconformance Reports when needed. An inspection failure decision and an NCR describe different parts of the work.

FAQ​

Business questions​

When should I use Rework rather than Scrap?​

Choose the disposition established for the failed goods. Rework routes stock to rework and creates an Open rework manufacturing order; Scrap routes to scrap hold and creates a Draft replacement manufacturing order.

Does failing the inspection finish the corrective work?​

No. The action records the failed quantity and starts stock and production follow-up. Check the resulting movement and manufacturing order; rework or replacement production still needs its own completion.

Can I fail only part of an inspection?​

Yes. A partial failed package count can create a new Open inspection for the remainder. Check that remainder separately from the completed failed quantity.

Technical questions​

What quantity does Inspected quantity represent here?​

It represents the package count used by this decision, converted using the configured quantity per package. Compare the packaging label and package total with the item-unit total before submission.

Which extra input does Rework need?​

Provide the instruction describing the rework. The action also needs the warehouse location setup used for the stock movement.

What must I check after submitting?​

Check the Completed inspection, its failed quantities and classification, any Open remainder, the movement destination/completion, and the Open rework or Draft replacement order.