Finished Goods Inspections
Use finished-goods inspections to connect the production and test evidence with a review or quantity decision, then verify the resulting stock and follow-up production work. Recording measurements, reviewing potential nonconformance, and accepting stock are separate jobs.
Open Quality Control → Inspections → Finished Goods Inspections. The side navigation labels this screen Finished Goods.
Prepare the inspection evidence
Match the manufacturing order, product, lot, packaging, and warehouse context. Use Update finished goods inspection to record the resin, testers, dates, consumed-material context, measured results, comments, and attachments.
Read package count together with the item's unit quantity. These are different measures of the same goods: the configured quantity per package converts one to the other. Check the finished-goods inspection record before making a quantity decision if the units are unclear.
Choose the current job
| Situation | Action and checkpoint |
|---|---|
| Measurements or production test evidence need recording | Use Update, save the readings, and reopen to compare them with the test evidence. |
| The inspection is in In Review | Submit inspection review. Check Reviewed, reviewer, and review date before the next quantity decision. |
| The tested quantity is ready for acceptance | Pass finished goods inspection. Check whether it becomes In Review or Completed, then verify the stock movement when completed. |
| The tested quantity failed | Fail finished goods inspection. Check the disposition, stock destination, and rework or replacement order. |
| The defect needs investigation and corrective-action tracking | Create an NCR from Nonconformance Reports and select the relevant inspection. |
Pass processing of an Open inspection can require review. A partial attempt can create an Open remainder before entering In Review, so reconcile the original and remainder quantities before any later quantity decision. This does not establish a mandatory review for every record or a universal acceptance threshold. Review records the assessment; the pass/fail quantity decision remains separate.
Check progress before handing stock forward
A partial pass or fail can create a new Open inspection for the remainder. Check the original's inspected quantities and the remainder together so the same goods are not treated as both finished and still awaiting a decision.
Completed can follow either a passed or failed quantity. Check the inventory movement destination and completion, and any follow-up manufacturing order, before relying on the result. Rework produces its own production work; a Draft replacement order is also work still to be completed.
Set to In Progress is offered from Draft or Open. Reverse is offered for Completed inspections and its confirmation describes returning stock to quality control and creating a new inspection request. Check stock availability and the resulting movement and request; it is not an undo for every connected production record.
If an action reports an error, inspect the inspection, any remainder or replacement, movement, and follow-up order before retrying. Carry the manufacturing order and lot context with the result.
FAQ
Business questions
Which job comes before a finished-goods decision?
Check the production identity and record the resin, testers, measurements, and supporting evidence. Read package count and item-unit quantity together before accepting or failing a quantity.
Is every inspection required to go through Review?
Use Review for an inspection in In Review. A pass attempt on an Open inspection can also send it there. Check the current state and findings rather than assuming every inspection must follow the same review sequence.
When should I create a nonconformance report?
Use an NCR when the defect needs issue identification, responsibility, investigation, corrective actions, and disposition tracking beyond the inspection quantity decision.
Technical questions
How do I know review submission succeeded?
The inspection becomes Reviewed and records the current reviewer and review date. Reconcile current quantities and any Open remainder before a later quantity decision.
What should I check after a partial pass or fail?
Compare the completed quantity with any new Open remainder inspection, then inspect the stock movement and any follow-up production order.
Does Completed alone establish stock readiness?
No. Both passed and failed quantities can complete an inspection. Check the movement destination, movement completion, and follow-up work before relying on stock readiness.