In-process inspection
An in-process inspection records quality work during manufacturing. Use it to identify the production work and lot being checked, understand the inspection's progress, and review the evidence behind a quality decision.
Open Quality Control → Inspections → In Process. The In Process Inspections table shows the production context, quantities, control point, status, and review information. Choose Inspection details to trace the record further. Inspection numbers use the QCP prefix.
Match the inspection to the production work
Start with the manufacturing order, product, and lot number. Read these together before interpreting a quantity or result: a matching product name alone does not identify the production work being inspected.
Inspection details brings the order and material context together:
| Information | How to use it |
|---|---|
| Inspection id and manufacturing order number | Identify the quality record and the production order it concerns. |
| Lot Number and warehouse | Check the lot and location associated with the inspection. |
| Manufacturing details | Compare the manufacturing date, item, variant, and order quantity with the work you are reviewing. |
| Lot numbers consumed | Trace the listed component lots, products, and quantities associated with this inspection. |
The consumed lots help you investigate which material was used. They describe material context; they are not the inspection's pass or fail result.
Read quantities in their context
The inspection table shows Quantity and Inspected quantity. Its Quantity is the inspection's total packaging quantity. In Inspection details, the Quantity under manufacturing information is the manufacturing order quantity.
Keep the order quantity and the inspection quantity distinct. Check the packaging and unit of measure before comparing numbers from different views. If a quantity does not match the lot or production work you expect, resolve the difference with the quality owner before relying on it for a decision. A quantity displayed as inspected does not, by itself, tell you that it passed.
Understand the control point and review evidence
The Control Point connects the inspection to an in-process control point. That configuration records required tests and work instructions. Use it to understand which checks belong to the inspection. Inspection Type identifies the method: Measurement, Voltage, or Visual.
Read Reviewed By and Reviewed on together. They record the reviewer and the date the review was completed. These details explain the review history; read the Status as well when deciding whether the inspection still needs work.
Use attachments and Comments to preserve the supporting evidence and explain exceptions. You can view and download attachments from Inspection details. The details panel also includes Inspection activity and the record's creation and update information, which help you trace changes when the current values need explanation.
Interpret the inspection status
Status describes progress through the inspection. It is not a substitute for checking the result and supporting evidence.
| Status | Meaning |
|---|---|
| Draft | The record has been created, but data collection has not started. |
| Open | The inspection has started and the inspector is on site. |
| In Progress | Inspection data is being collected and recorded. |
| In Review | Data recording is complete and supervisor review is pending. |
| Reviewed | Supervisor review is complete and the inspection is ready for a pass or fail decision. |
| Completed | The inspection is complete and its outcome has been recorded. Both pass and fail decisions use this status. |
| Reversed | The inspection has been recorded as reversed. |
For a failed inspection, Failure Type classifies the result as Scrap or Rework. That classification does not create a rework order or replacement manufacturing order. Recording an in-process pass or failure also does not move inventory. Check the relevant production and stock records when arranging the next work.
Check readiness before a decision
Before relying on an inspection for the next production decision:
- Match the manufacturing order, product or variant, lot, and warehouse to the work being checked.
- Confirm that the control point and inspection type describe the intended checks.
- Review the test evidence, attachments, and comments. Resolve unexplained quantities or missing evidence with the quality owner.
- Check the status alongside the reviewer and review date. Reviewed means ready for a decision; Completed still needs its outcome interpreted.
- For a failure, check the failure classification before arranging follow-up production work.
These are review checks. They do not establish permission to advance a production step or release stock.
Use Update when the inspection type, control point, review details, attachments, or comments need correction. Use Inspection details when you need the order, consumed lots, attachments, or activity history. Keep the inspection record available when handing an exception to the person responsible for production follow-up.
FAQ
Business questions
What production work does an in-process inspection describe?
It describes quality work during manufacturing and connects the inspection to a manufacturing order. Read the order, product, lot, and warehouse together, then use Inspection details to review the manufacturing context and listed consumed lots.
Does Completed mean the inspection passed?
No. Both pass and fail decisions mark an in-process inspection Completed. Review the outcome and supporting evidence; for a failed inspection, also check Failure Type.
Does choosing Rework create a rework order?
No. Rework classifies the failed inspection. The in-process failure decision records the result without creating a rework order, a replacement manufacturing order, or an inventory movement. Arrange the required follow-up through the responsible production work.
Technical questions
How do I trace the material used for this inspection?
Open Inspection details and read Lot numbers consumed. It lists component lot numbers, products, and quantities. Compare those entries with the manufacturing order and the lot being investigated.
What is the difference between In Review and Reviewed?
In Review means data recording is complete and supervisor review is pending. Reviewed means the supervisor review is complete and the inspection is ready for a pass or fail decision. Read the reviewer and review date alongside the status.
Where can I find the evidence behind the inspection?
Use attachments and Comments for supporting material and explanations. Inspection details lets you view and download attachments, and its Inspection activity and creation/update information help you trace the record's history.