In-process control point
An in-process control point defines quality checks associated with manufacturing work instructions. Use it to explain which work needs inspection, which tests and method apply, and how pending inspections are checked during work-order completion processing.
Open Quality Control → Configuration → QC Points - In Process. The list shows the point's name, status, control frequency, inspection type, and creation/update information. Open Update to review its full definition.
A control point is a reusable definition. An in-process inspection records quality work for a particular manufacturing order and links back to that definition. Saving a control point does not record test results or a pass/fail decision.
Check where the point applies
Read In Process Control Point and the Work instruction rows together. Choose a name that distinguishes the check, then use the instruction links to identify the manufacturing work it covers.
During work-order completion processing, active points are matched to the work order's work instructions. A matching point can create an Open in-process inspection linked to the manufacturing order, work order, and control point. A point without a matching work instruction does not supply an inspection through this matching step.
Before changing the links, compare them with the work instructions used on the intended work orders. Keep instruction ownership clear, and review overlapping active definitions with the quality owner. Use Notes to explain the purpose or handling details that another person needs when maintaining the definition.
Read the tests and inspection method together
Required Tests identifies the results expected for the inspection. Inspection Type describes how the check is performed. Selecting a test defines an expectation; the test result belongs to the individual inspection.
The available tests cover different quality concerns:
| Concern | Required Tests choices |
|---|---|
| Material characteristics | Carbon Black Content, Melt Flow Index, and Density. |
| Dimensions and shape | Outside Diameter, Min Wall Thickness, Max Wall Thickness, Ovality, and Out of Round. |
| Mechanical and pressure performance | Ring Tensile, Quick Burst, Time to Burst, and Reverse Bend. |
Choose Measurement for dimensional checks with gauges or calipers, Voltage for an electrical reading such as a spark test, or Visual for examination by eye.
Before using the definition, confirm that the selected tests and method agree with the intended work instructions and that the team can capture the required evidence. The test choices do not enter a measured value or define a numerical acceptance limit on this record.
Interpret the frequency choice
Control Frequency describes the intended inspection coverage. Read it alongside the work instructions so the people performing the checks know what coverage is expected.
| Choice | Meaning |
|---|---|
| Inspect All Units | Every unit is to be inspected. |
| Random Sampling | Sampling without a fixed schedule. |
| Periodic Checks | Checks at fixed time intervals. |
This definition has a frequency choice, but no sample-count or interval-length input. Agree the practical sampling or timing instructions with the quality team, and check the actual inspection records when confirming coverage.
Understand the completion policy
Completion policy controls a pending-inspection check during work-order completion processing.
| Choice | Effect of this check |
|---|---|
| Block Completion | Before creating new in-process inspections, the check looks for pending inspections on the same manufacturing order linked to active control points with this policy. If one is found, it reports the control point and pending status in an error. |
| Skip Enforcement | Excludes this point from the blocking set. Pending inspections linked to other active Block Completion points on the same manufacturing order can still cause an error. This choice does not record an inspection result. |
For this check, pending inspections are those in Open, In Progress, In Review, or Reviewed. A reviewed inspection still awaits its pass/fail decision.
If completion reports a pending-inspection error, review the named inspection and check the current work-order and material records before retrying. Material consumption and the work-order completion status can already have been saved before this quality check reports the error. Use the inspection's actual result when deciding the next quality action.
Interpret Active and Inactive
Active makes the point eligible for the work-instruction matching described above. Inactive excludes it from that matching. The list offers Deactivate for an active point and Activate for an inactive point, with a confirmation before the status change.
Review the affected work instructions and current inspection work before changing status. A control-point status change is a configuration decision; check individual inspection records separately for their progress and outcome.
Check the saved definition
Before relying on a point, reopen it with Update and compare:
- The name and work instruction rows with the manufacturing work the point should cover.
- Required tests and inspection type with the agreed inspection method and evidence.
- Control frequency with the practical sampling or timing instructions.
- Completion policy with the intended pending-inspection handling.
- Status and notes with the definition you intend production to use.
For a new definition, use Create in-process control point. To revise an existing definition, use Update in-process control point. Use the in-process inspection record when reviewing a specific lot, production context, or recorded outcome.
FAQ
Business questions
How is a control point different from an inspection?
A control point defines reusable work instruction links and inspection settings. An inspection records quality work for a particular manufacturing order. Keep the definition on the control point and the evidence and decision on the inspection.
Why do the work instruction links matter?
They connect the definition to manufacturing work. During work-order completion processing, an active control point matched to a work instruction can create an Open in-process inspection. Compare the linked instructions with those used on the intended work orders.
What should I review before deactivating a point?
Review its work instruction links and current inspection work with the quality owner. An inactive point is excluded from work-instruction matching. Check individual inspections separately; changing configuration status does not record their results.
Technical questions
What is the difference between Required Tests and Inspection Type?
Required Tests selects the expected checks, such as Density or Outside Diameter. Inspection Type selects the method: Measurement, Voltage, or Visual. Neither selection enters a test result on the control point.
Does Periodic Checks specify the interval length?
No. Periodic Checks describes checks at fixed intervals, but this record has no interval-length input. Agree the timing in the operating instructions and verify actual coverage in the inspection records.
Which inspections does Block Completion treat as pending?
The check looks on the same manufacturing order for inspections linked to active blocking control points in Open, In Progress, In Review, or Reviewed. If it reports a pending inspection, review that inspection and the current work-order and material records before retrying, because earlier completion updates can already have been saved.