Finished goods inspection
A finished goods inspection connects the product made on a manufacturing order with its test results, inspection decision, and stock movement. Use it to check what was tested, which quantity the decision covers, and whether further review or inspection is needed.
Open Quality Control → Inspections → Finished Goods Inspections. Use View inspection log to read the inspection details. Inspection numbers use the IS prefix. The manufacturing order number, lot number, product, and warehouse help you confirm that you are reading the right record.
Read the production and test information together
Start with the manufacturing order and lot. They identify the production being assessed. Check the product and warehouse alongside them before making a decision; a correct test result attached to the wrong production does not describe the goods in front of you.
The inspection brings several kinds of evidence together:
| Information | What to check |
|---|---|
| Manufacture date, Date Testing Completed, and Sample time (mins) | Whether the recorded timing describes the test you performed. The manufacture date and testing date have different meanings. |
| Ash Tester and Final Product Tester | Who performed the respective testing work. These are separate responsibilities on the record. |
| Resin type and consumed materials | The resin specification used for the assessment and the material quantities and identified stock numbers recorded with production. |
| Test results | The actual readings, including carbon black content, melt flow index, density, dimensions, and strength or pressure tests. |
| Comments and attachments | Supporting observations and files that explain the findings. |
Use Update to review the separate Min Wall Thickness (in) and Max Wall Thickness (in) readings. Read each value with its displayed unit. Diameter and wall measurements use inches; the strength and burst fields use their own pressure or time units.
Reverse Bend is an individual test result with Pass and Fail choices. It does not, by itself, describe the decision for the whole inspection. Keep the measurement, the overall inspection state, and any failure disposition distinct.
Interpret the state before choosing the next action
The state tells you where the inspection stands. It does not replace the test evidence or the failure classification.
| State | Meaning and next check |
|---|---|
| Draft | A preparation state. Check the record before starting work. Set to In Progress is available from Draft or Open. |
| Open | The inspection has started. Review its identity, quantities, and readings before recording a decision. |
| In Progress | Testing information is being collected. Update, Inspection Passed, and Inspection Failed are available. |
| In Review | The inspection needs an assessment before a pass or fail decision. Use Review to record that assessment. |
| Reviewed | The assessment has been submitted. A pass or fail decision remains a separate action. |
| Completed | A decision has been recorded. Check Fail Status and the related movement to understand the outcome. Both a passed decision and a failed decision can complete an inspection. |
| Reversed | The original inspection has been reversed. Follow the replacement Open inspection for the renewed assessment. |
An Open inspection can move to In Review during a pass attempt when recorded ovality, wall thickness, or carbon black content falls outside the applicable configured limits. In that case, the pass attempt stops before creating its stock movement. For a partial pass attempt, the original quantities may already have changed and a new Open remainder inspection may already exist. Reconcile those records before making another quantity decision; entering In Review does not mean that the attempt left the inspection quantities untouched. Use the actual product and resin specifications when assessing the readings; the field placeholders are examples, not acceptance limits.
Submitting a review requires an Inspection review description of at least 20 characters. It records the assessment, reviewer, and review date, and sets the inspection to Reviewed. It does not complete the pass or fail decision or move the goods.
Understand the quantity covered by a decision
Keep package counts separate from the product's unit quantity. The pass and fail forms use a package count for the inspected amount, even where the fail form labels it Inspected quantity. Read the adjacent packaging name and compare it with Total Packaging Quantity before submitting.
The decision quantity is calculated as:
Unit quantity = inspected package count × quantity in one package
The package configuration supplies the conversion. A decision cannot use more packages than the inspection currently holds; an amount above that count is capped to the available count. Check the resulting quantity instead of relying on the amount you entered.
For a partial decision, a new Open inspection is created for the remainder and linked to the original inspection. On the original record, Quantity and Total quantity inspected become the quantity covered by that decision. Total quantity in inspection remains the original total for that record. Follow the new inspection to find the remaining work.
For example, assume an inspection contains 100 packages, each holding 10 units. A completed decision for 30 packages covers 30 × 10 = 300 units. The original inspection retains its total of 1,000 units but records 300 units as inspected. The new Open inspection covers 70 packages, or 700 units. The remaining quantity has its own inspection; it has not inherited a pass or fail decision.
Understand what the decision changes
Before attempting a pass, check that the correct resin type is selected and that the configured required test values are present. A linked finished goods control point can require particular test values; missing values or numeric zero values in those required fields stop the pass attempt. The warehouse and packaging configuration must also support the movement and quantity conversion.
When a pass completes without requiring review, it creates and completes a movement from the warehouse's quality assurance location to its stock location. Check the movement as well as the inspection state when confirming the outcome.
For a failed quantity, Failure Type determines the next work:
| Failure Type | Consequence |
|---|---|
| Rework | The failed quantity is moved from quality assurance to the configured rework location, and a rework order is created for manufacturing. Provide an instruction explaining the work needed. |
| Scrap | The failed quantity is moved to the configured scrap hold location, and a draft replacement manufacturing order is created for that quantity. Scrap hold is the movement destination; the inspection does not document physical disposal. |
These decisions depend on configured warehouse locations. If a decision reports an error, inspect the current record, any new remainder inspection, and related movements before trying again. A state change alone is insufficient evidence that every connected action finished.
A nonconformance report records the issue and its follow-up separately. Open Quality Control → Nonconformance & Compliance → Nonconformance Reports, choose Create new report, and select the relevant inspection in Finished Goods Inspections. Follow Create nonconformance report to record the investigation. Use the inspection to interpret the tested quantity and decision.
Check a completed or reversed record
After a decision, compare the inspected package count with the converted unit quantity, check Fail Status, and confirm the related movement's quantity and destination. For a partial decision, also check the new Open inspection against the remainder.
Reverse is available on Completed inspections. It attempts to reverse the inspection's related movement, creates an Open replacement inspection, and marks the original Reversed with the reversal date and person. Reversal requires exactly one related movement and configured stock and quality assurance locations. The stock must still be available for the movement reversal. Check the replacement inspection and stock result before resuming testing.
FAQ
Business questions
What does a finished goods inspection tell me about production?
It brings the manufacturing order, lot, product, warehouse, test readings, and inspected quantity together. Use these values to identify the production tested and understand the decision made for that quantity.
Does Completed mean the goods passed?
Completed can describe either a passed or failed decision. Read Fail Status, the inspected quantity, and the related movement to distinguish the outcome and destination.
How do Scrap and Rework affect the next work?
Rework routes the failed quantity to the rework location and creates a rework order with your instruction. Scrap routes it to scrap hold and creates a draft replacement manufacturing order for the failed quantity.
Technical questions
Why can the inspected unit quantity differ from the number I entered?
The decision form takes a package count. It multiplies that count by the configured quantity per package to obtain the unit quantity. An entered package count above the inspection's available count is capped to that available count.
What changes when I submit an inspection review?
The description must contain at least 20 characters. Submission records the assessment, reviewer, and review date, and changes the state to Reviewed. A separate pass or fail decision is still needed.
Why might a completed inspection fail to reverse?
Reversal requires exactly one related movement and configured stock and quality assurance locations. It can also fail when the stock is no longer available at the location needed to reverse the movement. Check the movement and stock before retrying.