Finished goods control point
A finished goods control point defines the inspection work for selected finished products: the method, frequency, and required test values. Use it to check what an inspection is expected to capture. The control point is a reusable definition; the inspection records the measurements and decision for particular goods.
Open Quality Control → Configuration → QC Points - Finished Goods. The table shows QC Point, Status, Control Frequency, and Inspection Type. Open Update to read the product rows, required tests, and notes behind a definition.
Check which products share the definition
Quality Point Name identifies the inspection work. Give it enough meaning to distinguish the point from another check, then read its item rows to see the finished products it describes.
You can add several item rows when the same control is shared across products. Each row selects a finished product. Before changing a shared point, compare the proposed test list, method, and frequency with the needs of every listed product. A change to one shared definition should be an intentional choice for that whole list.
Distinguish the method from the frequency
Inspection Type describes how the check is performed. Choose the method that matches the agreed inspection work.
| Inspection Type | Meaning |
|---|---|
| Measurement | A dimensional check using gauges or calipers. |
| Voltage | An electrical reading, such as a spark test. |
| Visual | Examination by eye for defects. |
Control Frequency describes the intended coverage or timing. It answers a different question from the method.
| Control Frequency | Meaning |
|---|---|
| Inspect All Units | Every unit is inspected. |
| Random Sampling | Sampling without a fixed schedule. |
| Periodic Checks | Checks at fixed time intervals. |
The form records one of these frequency categories. It does not provide a sample-size value or an interval-length field. When selecting Random Sampling or Periodic Checks, agree the quantity or timing needed for the actual work and record useful context in Notes. A frequency label alone does not communicate a sample count or duration.
Read Required Tests as a list of expected results
Required Tests identifies which test values must be supplied on an inspection linked to this point. You can select several tests, grouped here by the information they capture:
| Concern | Available required tests |
|---|---|
| Material properties | Carbon Black Content, Melt Flow Index, Density |
| Dimensions and shape | Outside Diameter, Min Wall Thickness, Max Wall Thickness, Ovality, Out of Round |
| Mechanical and pressure checks | Ring Tensile, Quick Burst, Time to Burst, Reverse Bend |
Selecting a test does not enter a result. Record the actual reading or test outcome on the finished goods inspection.
When a finished goods inspection is linked to this control point, its pass action checks the selected required values. A missing value or a numeric zero value in a selected required field stops that pass attempt. Review the test selection and the actual recorded result when resolving the message.
For example, a point might require Density and Min Wall Thickness. If Density is recorded but Min Wall Thickness is missing, the required-value check is not satisfied. Supplying both required values satisfies that presence check; the inspection's overall pass or fail decision still needs its own assessment. The required-test list does not set the acceptable measurement limits.
Read the control point status separately from inspection results
Active is the default control-point status. Deactivate changes an Active point to Inactive. On an Inactive point, reactivate returns it to Active.
These states belong to the reusable definition. Check the linked inspection's own state and results when reviewing ongoing work. A control point can be referenced by finished goods inspections and rework orders, so use those references to understand which definition is associated with the work you are checking.
After deactivating or reactivating a point, confirm Status in the table. After editing its definition, reopen the same point and compare the item rows, Required Tests, Inspection Type, Control Frequency, and Notes with the intended change. Updated by and Last updated help identify the most recent recorded change.
Work with this definition
Use Create finished goods control point when you need a distinct inspection definition. Use Update finished goods control point when an existing point needs a changed scope, test list, method, frequency, or notes.
Keep the test readings and inspection decisions on the individual inspection. Saving a control point records the definition of the work to perform.
FAQ
Business questions
How does a control point differ from an inspection?
A control point defines the products, method, frequency, and required tests. An inspection records the actual results and decision for particular goods and can reference that control point.
Can one control point cover several finished products?
Yes. Add an item row for each product sharing the control. Review every listed product before changing the shared method, frequency, or required tests.
How should I choose Inspection Type?
Choose Measurement for a dimensional check, Voltage for an electrical reading, or Visual for examination by eye. The choice describes the method; Control Frequency separately describes the intended coverage or timing.
Technical questions
Where do I enter the sample size or periodic interval?
This form provides frequency categories rather than a sample-size or interval-length field. Select the agreed category and use Notes for useful working context. Confirm the quantity or timing needed for the inspection with the quality owner.
Why can a zero reading stop a pass attempt?
For a linked finished goods control point, the pass action rejects numeric zero as well as a missing value in any selected required field. Check the actual result and the Required Tests selection. This is a required-value check, separate from deciding whether the readings meet the specification.
How do I change an Inactive point back to Active?
Use reactivate on the Inactive point, then confirm that Status shows Active. Deactivate performs the opposite status change for an Active point. Check any linked inspection's results separately.