Update in-process control point
Change an existing inspection definition for in-process checks. A control point describes the work to inspect; an inspection records what happened in a particular case.
Open Quality Control → Configuration → QC Points - In Process.
Prepare the definition
Have the work instructions, required tests, inspection method, frequency, and completion policy agreed with the production team. For an update, compare the current selection with the intended replacement before saving. Reopen the same control point afterward so you can distinguish an edit from a newly created definition.
Add the Work instruction rows that this point should match. Work-order processing can use active control points matched to its work instructions to create in-process inspections.
Choose Measurement, Voltage, or Visual for Inspection Type. Use Required Tests to identify the readings needed, such as Outside Diameter, Density, or Min Wall Thickness. These are selected tests, not entered test results.
Inspect All Units covers every unit. Random Sampling describes sampling without a fixed schedule. Periodic Checks describes checks at fixed intervals. Choose the frequency agreed for this material or product; this form does not specify a sample size or an interval length.
For Completion policy, Block Completion checks for pending inspections linked to blocking control points on the manufacturing order during work-order completion processing. Skip Enforcement excludes this point from the blocking set. Pending inspections linked to other active Block Completion points on the same manufacturing order can still cause an error. Check both inspection and work-order states when a completion attempt reports a pending inspection; do not use the work-order label alone as evidence that quality checks passed.
Update the control point
- Find the control point you intend to change and select Update.
- Check and change In Process Control Point, then review the Work instruction rows using the selections described above.
- Set the inspection choices to the agreed definition. Add Notes for context the next inspector needs.
- Select Update QC Point.
Check the saved definition
Find the saved point in QC Points - In Process, open Update, and compare the name, work instructions, required tests, completion policy, method, frequency, and notes with what you intended to save. Check Status separately from the definition.
Saving this definition records configuration. It does not record a measurement or a pass/fail decision on an inspection. Keep inspection results with the relevant inspection record.
FAQ
Business questions
When should I update a in-process control point?
Update a point when its existing definition needs different scope, methods, or instructions. Review the current definition before replacing its choices.
How do I choose what this in-process point covers?
Add the Work instruction rows that this point should match. Work-order processing can use active control points matched to its work instructions to create in-process inspections.
Does updating the point finish an inspection?
No. This action saves the control-point definition. Measurements and inspection decisions belong to individual inspection records.
Technical questions
How do I choose Control Frequency?
Inspect All Units covers every unit. Random Sampling describes sampling without a fixed schedule. Periodic Checks describes checks at fixed intervals. Choose the frequency agreed for this material or product; this form does not specify a sample size or an interval length.
Which inspection inputs can I configure?
Choose Measurement, Voltage, or Visual for Inspection Type. Use Required Tests to identify the readings needed, such as Outside Diameter, Density, or Min Wall Thickness. These are selected tests, not entered test results.
How do I verify my saved changes?
Reopen the point with Update and compare its name, scope, method, frequency, and notes. Also compare Required Tests and Completion policy.