Update finished goods control point
Change an existing inspection definition for finished goods checks. A control point describes the work to inspect; an inspection records what happened in a particular case.
Open Quality Control → Configuration → QC Points - Finished Goods.
Prepare the definition
Have the material or product selection and the agreed inspection method and frequency ready. For an update, compare the current selection with the intended replacement before saving. Reopen the same control point afterward so you can distinguish an edit from a newly created definition.
Add the item rows for the finished products this point describes.
Choose Measurement, Voltage, or Visual for Inspection Type. Use Required Tests to identify the readings needed, such as Outside Diameter, Density, or Min Wall Thickness. These are selected tests, not entered test results.
Inspect All Units covers every unit. Random Sampling describes sampling without a fixed schedule. Periodic Checks describes checks at fixed intervals. Choose the frequency agreed for this material or product; this form does not specify a sample size or an interval length.
Update the control point
- Find the control point you intend to change and select Update.
- Check and change Quality Point Name, then review the item rows using the selections described above.
- Set the inspection choices to the agreed definition. Add Notes for context the next inspector needs.
- Select Update Control Point.
Check the saved definition
Find the saved point in QC Points - Finished Goods, open Update, and compare the name, products and required tests, method, frequency, and notes with what you intended to save. Check Status separately from the definition.
Saving this definition records configuration. It does not record a measurement or a pass/fail decision on an inspection. Keep inspection results with the relevant inspection record.
FAQ
Business questions
When should I update a finished goods control point?
Update a point when its existing definition needs different scope, methods, or instructions. Review the current definition before replacing its choices.
How do I choose what this finished goods point covers?
Add the item rows for the finished products this point describes.
Does updating the point finish an inspection?
No. This action saves the control-point definition. Measurements and inspection decisions belong to individual inspection records.
Technical questions
How do I choose Control Frequency?
Inspect All Units covers every unit. Random Sampling describes sampling without a fixed schedule. Periodic Checks describes checks at fixed intervals. Choose the frequency agreed for this material or product; this form does not specify a sample size or an interval length.
Which inspection inputs can I configure?
Choose Measurement, Voltage, or Visual for Inspection Type. Use Required Tests to identify the readings needed, such as Outside Diameter, Density, or Min Wall Thickness. These are selected tests, not entered test results.
How do I verify my saved changes?
Reopen the point with Update and compare its name, scope, method, frequency, and notes. Also compare Required Tests.