Skip to main content

QC Points - Finished Goods

Use QC Points - Finished Goods to maintain reusable definitions for finished-goods checks. The definition describes the finished products, method, frequency, and instructions; individual inspection records hold the results.

Open Quality Control → Configuration → QC Points - Finished Goods.

Choose a new definition or an existing one​

Use Create finished-goods control point when the work needs a distinct definition. Have the intended finished products, name, inspection method, and control frequency ready.

Use Update finished-goods control point when an existing definition needs a change. Read its current scope and settings first, then compare the saved definition after the edit. Required Tests identifies the readings needed, separately from Inspection Type, which names Measurement, Voltage, or Visual.

Check scope and inspection choices​

Read the selected finished products with the method and frequency. Inspect All Units means every unit, Random Sampling describes sampling without a fixed schedule, and Periodic Checks describes checks at fixed intervals. These labels do not specify a numerical sample size or interval in this form.

Manage status separately​

Active and Inactive describe the control point's configuration state. reactivate is offered for Inactive points; Deactivate is offered for Active points. Check Status after changing it, and review the associated production or inspection work before changing a definition in use.

Reopen Update and compare the saved scope, method, frequency, notes, and required tests. Saving or changing configuration status does not record a test measurement or finish an inspection.

FAQ​

Business questions​

When do I need a new finished-goods control point?​

Create a separate definition when the check needs its own scope, method, frequency, or instructions. Update an existing definition when that same check changes.

What should I have ready before changing a point?​

Have the intended finished products, inspection method, frequency, and instructions agreed. Read the existing selection before replacing it.

Does activating a control point pass an inspection?​

No. Activation changes the configuration state. Individual inspections record measurements and outcomes.

Technical questions​

What do the frequency choices mean?​

Inspect All Units means every unit. Random Sampling describes sampling without a fixed schedule. Periodic Checks describes checks at fixed intervals; the choice does not supply a numeric interval here.

How do I change the configuration status?​

Use reactivate for an Inactive point or Deactivate for an Active point, then check Status.

How do I verify an edited definition?​

Reopen Update and compare the scope, method, frequency, notes, and required tests with the intended definition.