Complete goods receipt
Complete a prepared goods receipt after checking the physical delivery. This action creates and completes its inventory movement and refreshes purchase-order receiving information.
Check before finalizing
Use a Draft or Confirmed receipt. Compare its vendor, purchase order, warehouse, products, and quantities with the delivery. Each receipt line must match a line on the purchase order.
The warehouse needs a stock location. If active raw material inspection control points apply to the goods, it also needs a Quality Assurance hold location. Completion creates inspection work and uses the hold location in that case. Check the resulting movement destination before treating the delivery as available stock.
For a receipt mixing inspected and uninspected items, check the resulting destination and availability for all items; do not assume the uninspected lines went directly to stock. Several control-point inspections can cover the same intake, so their quantities must not be summed as additional deliveries.
For each line, quantity already received plus this receipt must be no more than the ordered quantity. For example, if 40 of 100 units have already arrived, at most 60 more can be completed against that line. A form message mentioning 5% tolerance does not override this limit.
If a line is not part of this delivery, return to Update and remove it before completing. Entering zero in the completion panel does not cancel that line's previously saved quantity.
Finalize the receipt
- Open Purchasing → Procurement → Goods Receipt and find the receipt.
- Choose Complete and check the purchase-order and receipt references.
- Select Received by and validate each Quantity received against the physical count and line unit.
- Add proof of receipt and notes where needed.
- Choose Finalize goods receipt.
Verify receiving and the next handoff
Check that the receipt is Completed. Compare the purchase order's current received and outstanding quantities with this delivery. Inspect the associated inventory movement and any created raw material inspection work.
Completed describes receiving. It does not establish quality release or payment. Check inspection work for goods on hold. Check Billing separately before generating a vendor bill.
If completion reports a missing stock or QA location, ask the warehouse setup owner to correct that location and retry after checking the receipt. If it reports an over-receipt, compare the current order balance with the count and correct the receipt before retrying.
For a completed receipt entered by mistake, reversal has separate conditions: billing must still be Not Billed, and a linked completed raw material inspection must be reversed first. See the goods-receipt explanation before correcting a completed intake.
FAQ
Business questions
What changes when I complete a receipt?
Completion creates and completes the receiving inventory movement, marks the receipt Completed, and refreshes purchase-order receiving and billing information.
Does Completed mean quality release?
No. Where active raw material inspection control points apply, completion creates inspection work and uses a QA hold location. Check that work and the movement destination before treating the goods as released.
Can I reverse a mistaken completed intake?
Reverse is offered for Completed receipts, but billing must still be Not Billed and no linked raw material inspection may remain Completed. Address those conditions before attempting reversal.
Technical questions
Which receipts show Complete?
The Goods Receipt list shows Complete for Draft and Confirmed receipts.
Why does completion reject an excess quantity?
It compares the current order's already received quantity plus this receipt with the ordered quantity. That total cannot exceed the order.
What warehouse setup is needed?
The warehouse needs a stock location. When inspection control points apply, a Quality Assurance hold location is also required.