Procure to pay and receive
Use this process to follow a vendor purchase from an agreed offer through receiving, inspection where required, billing, and bank reconciliation. Keep three outcomes in view: what arrived, what was released for use, and what was billed and settled.
You can start from an accepted request for quotation or create a purchase order directly. For a warehouse inventory purchase, receiving creates the next two branches: quality work where control points apply, and vendor billing. Check both before treating the purchase as finished.
The inspection branch and billing branch have separate checkpoints. Billing does not itself release material from Quality Assurance hold, and recording payment does not itself establish bank reconciliation.
Check the purchase and receiving setup
Before confirming a purchase, check the vendor, items, quantities and units, price, currency, payment terms, and delivery destination. The purchase-order explanation shows how to read those values together.
For an inventory purchase, each order line needs its vendor item and internal product mapping. Keep inventory purchases separate from service and non-inventory purchases: confirmation rejects an order that mixes them.
The receiving warehouse needs a stock location. If active raw material inspection control points apply, it also needs a Quality Assurance hold location. Check that setup before the delivery reaches the completion stage.
For later payment and reconciliation, prepare the appropriate bank account and ledger information. Reconciliation requires the bank transaction's account and warehouse assignment, an active ledger account for that bank account, and the applicable finance defaults. Resolve a reported setup gap before processing the transaction.
Agree the purchase and confirm the order
If an accepted vendor offer is recorded in Purchasing → Procurement → Request for Quotations, use Generate purchase order to prepare the new order form. Review the carried vendor, lines, currency, terms, warehouse, and addresses, then save the order. Opening the form is separate from saving the purchase order.
Follow Create a purchase order from an accepted request when the RFQ is your starting point. If the purchase is already agreed, use Create a purchase order directly.
Review the draft in Purchasing → Procurement → Purchase Orders before using Confirm. Confirmation checks the vendor, warehouse, and inventory-line mapping. It can also update vendor prices when the Purchasing setting enables that behavior and runs release processing for a selected blanket purchase order. Check the order's pricing source before making that commitment. Confirmation alone does not prove a release was recorded: check the agreement's released and open quantities, because unmatched lines and quantities above remaining capacity are left off the release.
For a normal inventory purchase, the confirmed order is ready for receiving preparation. The order's confirmation status does not mean that the delivery has arrived.
Register the delivery, then complete receiving
Use Generate receipt on a Confirmed or In Process normal purchase order to carry its references and receiving lines into a goods-receipt form. Compare the form with the actual delivery. Enter the quantities for this intake, identify the receiver, and add notes or proof of receipt where needed.
Choose Register goods to create the receipt. Check the new GR number, purchase-order reference, quantities, and Confirmed status in Purchasing → Procurement → Goods Receipt. Registration prepares the intake; completion processes its inventory movement.
The receipt creation guide explains that handoff. Then follow Complete goods receipt after verifying the physical count.
For each line, already received quantity plus this receipt cannot exceed the ordered quantity. Use the current purchase order when checking the balance, especially if another delivery was processed after this receipt was prepared. A form message mentioning 5% tolerance does not override the completion limit.
Successful completion creates and completes the receiving movement, marks the goods receipt Completed, and refreshes the purchase order's receiving and billing information. Check the movement destination as well as the receipt status. The goods-receipt explanation separates receiving, inspection, and billing indicators.
Resolve the quality branch for held material
When active raw material inspection control points apply, completion creates inspection records and uses the warehouse's Quality Assurance hold location. Open Quality Control → Inspections → Raw Material Inspections and identify the inspection by its item, purchase order, warehouse, lot, and quantity.
For an intake mixing inspected and uninspected items, verify the receiving movement and availability for every item. Do not assume uninspected lines went directly to ordinary stock. Several control-point inspections can cover the same material quantity; account for their separate decisions without counting them as additional deliveries.
Record the required test information and review the applicable specification before making a quantity decision. Inspection Passed processes the passed quantity, marks that inspection Completed, and creates a movement from QA hold to the warehouse's stock location.
If you pass only part of the inspection quantity, a new Open inspection carries the remainder. A partial failure also creates a remainder inspection. Account for those additional records before concluding that the entire delivery has been inspected.
Inspection Failed also marks the decided inspection Completed. The available failure type is Scrap, but its processing movement uses the configured vendor location. Check the actual destination with the quality team before committing the failure; the disposition name alone does not establish a movement to a scrap location. A Completed inspection can represent a pass or a failure, so its status alone is not a release decision.
Use the raw material inspection explanation to interpret the quantities, test information, and outcome. Billing can proceed separately once its receiving and billing conditions are met; a bill does not clear outstanding inspection work.
Generate and review the vendor bill
Choose the source that matches the quantities you intend to bill:
| Source | When it fits | Check before generation |
|---|---|---|
| Completed goods receipt | You are billing the quantities on a particular intake. | Receipt Billing is Not Billed, matching order lines have billable balances, and receipt quantities fit those balances. |
| Purchase order | You are selecting quantities to bill against an order that is at least partially received. | The order is In Process, its receiving status is Partially Received or Received, and the selected billing quantities match the vendor paperwork. |
Generate bill creates a vendor bill in Posted status. Generation from a receipt uses matching order lines and the receipt quantities, then marks the receipt Billed. Check the vendor, purchase-order reference, quantities, currency, tax, freight, and bill total in Finance → Accounts Payable (Purchases) → Vendor Bills.
Treat this as an accounting handoff. Review the vendor's invoice against the order and delivery before generation; completing receiving and generating a posted bill are separate decisions. A Billed receipt identifies billing progress, while payment and reconciliation remain separate work.
Record payment and reconcile the bank result
From Vendor Bills, select the bills and choose Pay bills by ACH, Pay bills by wire, or Pay bills by check. Review the bank account, bill amounts, ledger assignments, and any selected vendor credits before posting the payment work. The payment actions accept bills with Unpaid, Overdue, or Partially Paid payment status.
ACH and wire processing record payment amounts and prepare pending payment matches for reconciliation. These actions do not send the bank transfer. Arrange the transfer through your banking process and retain its reference before treating the payment as sent.
The check route creates checks in Ready to Print status. Continue the check-printing work in Finance → Cash & Bank → Check Payments, verify the bank check numbers, and finish the print confirmation. Ready to Print is not evidence that the check has been printed or cleared.
When the corresponding bank transaction is available, open Finance → Cash & Bank → Reconciliation for the correct bank account and period. Review the proposed bill match against the bank amount, currency, vendor, and references. A payment match can propose a group of bills; verify the complete selection before using Reconcile.
Reconciliation creates a reconciliation record, marks the bank transaction Reconciled, and updates the selected bills' reconciled amounts. Where a pending payment match was used, it becomes Matched. Check the bill's reconciliation information and the bank transaction together.
The bank transaction is separate from the recorded payment. If statement activity came through a file, the bank-import explanation helps you inspect that processing result before relying on its transactions.
Choose the branch that matches the purchase
| Situation | Follow this path | Completion check |
|---|---|---|
| Only part of an inventory order arrives | Register and complete the actual intake; repeat receiving for later deliveries within the remaining order balance. | Current received and remaining quantities explain each delivery. |
| Service or non-inventory purchase | Confirmation marks those order lines received and sets the order In Process, allowing billing without a warehouse goods receipt. | Received describes the billing-ready order state here, not physical warehouse intake. |
| Vendor ships directly to the customer | Use Mark as delivered on the drop-ship order. | Check the purchase order and linked sales order quantities; use Confirm vendor delivery. |
| Vendor grants a credit | Create the vendor credit memo in Finance and post it before selecting it in payment work. | Check the credit's remaining amount and the bill amount before applying it. The payment route applies the selected credit's full remaining amount and rejects credit above the available payment amount. |
A failed inspection does not automatically establish a vendor credit. Resolve the material disposition and the commercial adjustment as separate work, then compare the resulting records.
Recover without losing the delivery or payment trail
If receiving rejects an excess quantity, compare the actual count with the order's current received balance and correct the receipt before retrying. If it reports a missing stock or QA location, have the warehouse setup corrected and recheck the intake.
For a completed receipt entered by mistake, Reverse requires billing to remain Not Billed. A linked Completed inspection blocks receipt reversal until the inspection is reversed first. Check the resulting movements and refreshed order quantities after correction; reversing receiving is not a way to undo a posted bill or bank payment.
If a bill shows Paid but Unreconciled, compare its recorded payment with the bank transaction rather than entering another payment. The recorded amount and the amount reconciled to the bank are separate values. Confirm the bank activity and its selected bill match before reconciling.
Check a partial delivery from end to end
Assume an inventory order covers 100 units and the first delivery contains 40 units. Register and complete a receipt for 40. The order still has 60 units to receive.
If this intake requires inspection, the 40 units go through the quality branch. Passing 30 creates the release movement for 30 and an Open inspection for the remaining 10. Account for that remainder separately, even if the receipt has already been billed.
Before generating a bill for the intake, compare its 40 units with the vendor invoice and remaining billable balance. After the posted bill is correct, record the appropriate payment work. Once the actual bank transaction is available, review its match and reconcile it. Completion for this intake means its material decisions, billing, payment record, and bank match are accounted for; the other 60 ordered units are still outstanding.
FAQ
Business questions
Must every purchase begin with a request for quotation?
No. You can prepare a purchase order directly. When an accepted RFQ is the agreed basis, Generate purchase order opens a prefilled order form for review and saving.
Must inspection finish before I generate the vendor bill?
Bill generation checks receiving and billable quantities; it does not require the raw material inspection to be Completed. Keep the inspection work separate and check its outcome before releasing held goods for use.
Does Pay bills by ACH or wire send the money to the bank?
No. These payment actions record payment amounts and prepare reconciliation matches. Arrange the transfer through your banking process and use the actual bank transaction to verify the result.
Technical questions
What limits a partial receipt against the order?
Already received quantity plus the new receipt cannot exceed the ordered quantity. With 40 received from an order of 100, at most 60 additional units can be completed against that line, regardless of a 5% tolerance message on the form.
What happens to the remainder after a partial inspection decision?
A partial pass or failure creates a new Open inspection for the remaining quantity. The decided inspection becomes Completed for the quantity processed. Track both records so the whole intake is accounted for.
Why can a bill be Paid and still Unreconciled?
Paid is calculated from the recorded payment amount; reconciliation is calculated from the amount matched through bank reconciliation. A recorded payment can therefore remain unreconciled until the corresponding bank transaction is reviewed and reconciled.