Skip to main content

Work center type

A work center type groups production resources by function. Read it to understand the kind of operation a work center represents, rather than the identity of an individual machine.

Read the classification​

Type name identifies the production function, such as Assembly or Welding. These are illustrative names. Description explains the role in production, so that similar names remain distinguishable.

The Operation type rows and Skill rows describe different aspects of the classification: the operations involved and the skills associated with them. Compare both lists with the function you intend to represent.

Follow where the type is used​

Work centers, routing nodes, and operation lines on bills of materials and manufacturing orders reference work center types. These references let you trace the classification used for a production step. Check the type on the relevant resource or operation when its classification appears inconsistent.

The catalog lists Draft, Active, and Inactive. Read the actual state on the record; the list is not a prescribed transition sequence.

Open Manufacturing → Configuration → Work Center Types. Create a type for a distinct classification or update it to correct its definition.

FAQ​

Business questions​

How does a type differ from a work center?​

A type is a functional classification. A work center is the individual production resource assigned to a type.

Where can this classification matter?​

Work centers, routing nodes, and manufacturing/BOM operation lines reference it. Compare those references when tracing a production step.

When should I revise an existing type?​

Revise its definition when its name, purpose, operation types, or associated skills no longer describe the intended classification.

Technical questions​

What should I read together?​

Read Type name and Description first, then the Operation type and Skill rows to understand the full classification.

Are operation types and skills the same list?​

No. They are separate repeating groups in the work center type definition.

Which record states are listed?​

Draft, Active, and Inactive are listed. That list alone does not determine which change is appropriate for your production resource.