Work center
A work center represents a production resource where routing operations take place. Read its availability, item capacity, and time standards together when checking whether the resource is suitable for planned work. Work orders, production reports, and time tickets identify the work center used for that work.
Open Manufacturing → Configuration → Work Centers. The list shows the center's name, code, type, work site, warehouse, status, available hours per day, and cost per hour. Use Update to inspect its settings.
Identify the resource and its location
Start with Work Center Name and Work center code. Compare both when several production lines have similar names. The description can add the practical context your team needs to recognize the resource.
Read Work site, warehouse, and Work Center Type as separate parts of the resource's context:
| Information | What to check |
|---|---|
| Work site | The production site associated with this resource. |
| Warehouse | The warehouse associated with this resource. Check it separately from the work site when tracing inventory context. |
| Work Center Type | The classification assigned to the resource. Compare the type as well as the name when choosing between centers. |
A manufacturing order can name a preferred work center and identify centers on its operation lines. A work order identifies the center assigned to that operation. When tracing a planned operation, compare those references with the resource you are reviewing.
Read availability and output capacity together
Available hours per day, on Basics, records daily time availability. On Capacity, Maximum output capacity contains item-specific output rates. Read each rate with its Product, any attribute restrictions, Output per hour, and Unit of Measure. A rate for one product or unit is a different planning assumption from a rate for another.
Minimum output capacity records the minimum finished-goods quantity that should run in this center for one order. Check its item and unit of measure before comparing that quantity with a proposed run. Keep the minimum quantity separate from the hourly output rate.
For example, suppose an output row is 200 kg per hour and a proposed run is 600 kg of the same product. A manual rate check gives 600 ÷ 200 = three hours of production. This example excludes setup, cleanup, changeovers, and downtime. Compare the scheduled operation with those additional time demands before treating the run as feasible.
Distinguish preparation from production time
The Capacity tab groups the resource's time standards. Read the units carefully: daily availability is in hours, while setup, cleanup, and changeover values are in minutes.
| Setting | How to interpret it |
|---|---|
| Default setup time | Preparation time associated with starting work. |
| Default cleanup time | Time associated with cleaning or resetting after work. |
| Full changeover time (minutes) | Preparation time to start producing a different finished good. |
| Default running changeover (minutes) | Preparation time to start producing a different variant of the same product. |
| Partial changeover | Item-to-item entries containing From item, To item, and Changeover time (min). |
For a partial changeover, read the item pair in its recorded direction. An entry from item A to item B describes that change. Check for the reverse pair separately when production will move from B to A. Compare the time with the intended changeover before relying on it in a plan.
Interpret status and a planned outage separately
The record supports these status meanings:
| Status | Meaning |
|---|---|
| Draft | A draft work-center record. |
| Active | The center can receive work orders. |
| Deactivated | The center cannot receive work orders. |
| Downtime | The center is temporarily unavailable. |
Activate changes a Draft or Deactivated center to Active. Reactivate returns a Downtime center to Active. Deactivate changes an Active center to Deactivated. Check the current status and the production plan before changing availability.
For a dated outage, Log downtime records a maintenance work order for the selected work center. Its start and end define the reserved period, and its downtime reason and description explain the interruption. Reasons distinguish changeovers, equipment failure, planned maintenance, labor, safety, supply, and other causes. Choose the reason that describes the interruption, then add useful detail in the description.
The end must be later than the start. Both dates must fall on the current UTC day or later. An overlapping work order prevents the maintenance entry from being saved; reschedule conflicting Draft/Open production work through the update task before trying again. Other conflict states need planner review; this action does not provide their reversal. The saved maintenance work order carries the outage period and reason.
For example, an outage from 13:00 to 14:30 reserves 90 minutes. A work order from 14:00 to 15:00 overlaps that interval and needs to be moved before the outage can be registered.
Check cost settings on the right basis
The Costing tab keeps Cost per hour, Fixed Cost, Cost per unit, and Idle cost per hour separately. Cost per hour is the resource's hourly operating cost. Cost per unit describes the cost of producing one unit of output. Fixed Cost represents costs that remain constant with output quantity, such as depreciation or rent. Idle cost per hour describes the cost while the line is idle.
Before comparing centers, check the record's currency and compare like-for-like rates. Review the planned and actual costs on the work order when checking the cost of a particular operation. Keep the work-center settings and the operation's recorded results in view together.
Review material and reporting settings
On Machine settings, Machine blending mode identifies the material basis used by the center:
| Mode | Recorded meaning |
|---|---|
| No Blending | Uses one pre-mixed material, with material consumption equal to production output at a 1:1 ratio. |
| Additive Let-down (Virgin Basis) | Deducts regrind from total weight first, then bases additive percentages on the remaining virgin mix. |
| Total Weight Basis | Bases every ingredient's percentage on total production weight; the percentages total 100%. |
Check this choice against how the line actually receives and blends material. It distinguishes the basis of the material calculation.
On Reporting, review the separate warning and error levels for under-reporting and over-reporting, together with Maximum Rejection Rate and Maximum Rework Rate. On Capacity, review % Over Output Warning and % Over Output Error beside the item output rates. Keep each threshold with the concern it describes when reviewing reporting tolerances with your production team.
Trace what happened at the center
Production reports identify where output was reported, and time tickets identify where time was logged. Use the work-center reference to check that output and time belong to the intended resource before comparing them with its capacity settings.
A tool asset can identify the work center where it is currently being used. This gives you equipment context when reviewing a resource. A production non-conformity report can also identify the production line, helping you trace a quality issue to the affected work center.
Before acting, check the center's identity and location, its status, the item and unit on its capacity rows, the direction of any partial changeover, and any outage period. Use Update for resource settings and Log downtime for a dated interruption.
FAQ
Business questions
How is a work center different from a work order?
A work center is the production resource. A work order identifies work assigned to a center. Read the work-center record for resource settings and the work order for the particular operation.
How should I distinguish deactivation from a planned outage?
Deactivated means the center cannot receive work orders. A dated outage entered through Log downtime creates a maintenance work order with a start, end, reason, and description. Use that period when checking the planned interruption.
Why check work site, warehouse, and work-center type separately?
They describe different context: the associated production site, the associated warehouse, and the resource's classification. Check all three when similar center names could lead you to choose the wrong resource or inventory context.
Technical questions
Is available time per day the same as output per hour?
No. Available time records hours per day. Output capacity records a rate for a product and unit of measure. Read both when assessing a run, then account for its setup, cleanup, changeovers, and downtime.
When do full and running changeover times describe different work?
Full changeover time describes preparation for a different finished good. Running changeover time describes preparation for a different variant of the same product. For an item-to-item entry under Partial changeover, also check the recorded From item, To item, and minutes.
Why can an outage period be rejected?
The end must be later than the start, both dates must be on the current UTC day or later, and the period must have no overlapping work orders at that center. Reschedule conflicting Draft/Open production work through Update and verify its saved dates. Refer other conflict states to the production planner before retrying.