Time ticket
A time ticket records a period of labor or production time with its employee, operation, work center, and cost context. Use it to explain where recorded time came from and how it contributes to the cost of a work order. Ticket numbers use the TT prefix.
To review time in an operation's context, open Manufacturing → Operations → Work Orders, choose Details, and find Time reports for work order. Compare the employee, Clock in time, and Clock out time with the operation you are investigating. The work order explains the operation; this page explains the time record behind it.
Establish where the time came from
Read the ticket's source before interpreting its dates or employee. The source distinguishes three kinds of time:
| Source | What it represents |
|---|---|
| Production Report | Time captured through reported production output. Use the related production report to understand its hours and production context. |
| Work Order | Time booked to a specific operation. Match its work-order and manufacturing-order references to the job being reviewed. |
| Work Shift | General shift hours rather than time specific to a job. Keep that scope in view when comparing it with operation time. |
Completing a production report creates time tickets from its productive hours and downtime lines. Their time windows are constructed from the report date and reported hours: downtime intervals come first, followed by the productive interval. The associated employee is the report's creator. Read that origin before attributing the interval to an individual operator's clock events.
The work center identifies the production resource and supplies the ticket's hourly cost information. During ticket calculation, the work-order reference supplies its work center. If a production-report reference is also present, that report's work center takes precedence. Compare the source references when the center differs from the one you expected.
Use the production report for shift context when tracing report-generated time. Keep the ticket's source, its operation, and the report's shift together when discussing which production period the time belongs to.
Read the time window and break information
The start records when logging began, and the end records when it stopped. With valid start and end dates, the ticket calculates duration as end minus start, in minutes. The calculation flags an end before the start as an error.
An ongoing ticket without an end date does not yet describe a closed interval. Check its final end time before treating its duration and cost as final.
Read the three minute values separately:
- Duration minutes is the elapsed interval between start and end.
- Break minutes records minutes on break.
- Net productive minutes is set equal to duration by the ticket calculation. That calculation does not deduct Break minutes.
For example, a ticket from 09:00 to 10:30 has 90 duration minutes. If Break minutes is 15, the calculation still records 90 net productive minutes. Subtracting the break yourself gives 75 minutes, but that is a separate review calculation and does not match the ticket's calculated net value.
Use the source record and time classification when deciding what the interval represents. The name Net productive minutes alone does not establish that breaks or reported downtime have been removed.
Understand the cost basis
The ticket takes Work Center Cost Per Hour and Work Center Idle Cost Per Hour from its work center. Its total uses the ordinary hourly rate and elapsed duration:
Total Cost = Work Center Cost Per Hour × Duration minutes ÷ 60
The calculation records the result to five decimal places. Read the result in the ticket's currency and compare it with the rate recorded on that ticket.
For an illustrative rate of 48 per hour and 90 duration minutes, Total Cost is 48 × 90 ÷ 60 = 72. The 15 break minutes in the earlier example do not reduce this calculation. The idle hourly rate is stored separately; the ticket's cost calculation does not switch to it based on the time type.
When work-order totals are calculated, the associated tickets' duration minutes supply Actual minutes, and their Total Cost values supply Actual labor cost. Match both the manufacturing order and work order when reconciling those totals. Two tickets can contribute more recorded labor minutes than the operation's calendar interval, so compare the individual ticket windows and people before explaining the difference.
Interpret activity and review state separately
Time Type classifies what the time concerns. Production covers making output. Setup and Cleanup describe preparation and cleaning around the run; Changeover describes switching products. Maintenance covers equipment service, Quality Control covers inspection or testing, and Rework covers correcting defective output. Idle and Break distinguish waiting from an operator's rest period.
Read this classification beside the source and reported activity. A Production Report source can include tickets created from downtime as well as productive hours, so inspect the report before interpreting every such ticket as productive machine running time.
The ticket's review status describes a different concern:
| Status | Meaning |
|---|---|
| Draft | A draft time-ticket record. |
| Ongoing | An employee is clocked in and has not yet clocked out. |
| Confirmed | The shop-floor worker has confirmed the time is accurate. |
| Approved | The direct manager has approved the time as accurate. |
| Completed | The time has been counted as part of a manufacturing cycle. |
| Canceled | The time ticket has been canceled. |
These meanings distinguish the states; they do not establish a mandatory approval sequence for every source. Tickets created when a production report is completed are calculated and completed during that processing.
Clock In Status separately distinguishes Clocked In, with time accruing, from Clocked Out, with no time accruing. Read it alongside the ticket status and end date when checking whether the interval is still open.
Check a ticket before interpreting an operation's time
Start with the ticket number, employee, source, manufacturing order, and work order. Then compare the start and end, elapsed minutes, break information, time type, cost rate, and currency.
For report-generated time, return to the production report's productive hours, downtime lines, and shift context. For job-specific time, return to the work order's time-report list. Investigate an unexpected center against both references when the ticket has a work order and production report.
Keep review state separate from arithmetic. A Confirmed ticket describes the worker's accuracy check, while Approved describes manager approval. Neither label explains a cost difference without the duration and rate. Use the manufacturing order for the overall production commitment and quantities.
FAQ
Business questions
How does a ticket's source change the way I should read it?
Production Report means the time comes from reported production; check its productive hours and downtime. Work Order means time booked to a specific operation. Work Shift means general shift time rather than job-specific time. Use the source to choose the record that explains the interval.
Why does the ticket distinguish Production, Setup, Idle, and other time types?
Time Type identifies the activity represented by the time, such as making output, preparing a machine, waiting, or taking a break. Read that classification with the source record when explaining how the production period was spent. The classification does not itself select a different rate in the ticket's cost calculation.
Does Confirmed mean a manager has approved the time?
Confirmed records the shop-floor worker's confirmation that the time is accurate. Approved records the direct manager's approval. Completed describes time counted in the manufacturing cycle. Read the actual state rather than treating these labels as interchangeable checks.
Technical questions
Are Break minutes deducted from Net productive minutes?
No. The ticket calculation sets Net productive minutes equal to the elapsed duration between start and end. Break minutes is stored separately. For a 90-minute interval with 15 break minutes, the calculated net remains 90 minutes.
How is Total Cost calculated?
Total Cost is Work Center Cost Per Hour multiplied by duration minutes divided by 60, recorded to five decimal places. A rate of 48 per hour for 90 minutes gives 72 in the ticket's currency. This calculation uses elapsed duration and the ordinary work-center rate.
Which work center is used when both a work order and production report are linked?
The ticket calculation first takes the work center from the work order, then uses the production report's work center when that report reference is present. Check the report and operation together when investigating an unexpected center or hourly rate.