Manufacturing settings define module policies for reporting, material consumption, costing, and scheduling. Read the selected policy and its related numerical value together when diagnosing a production result or validation message.

Interpret reporting checks​

Raw Material Posting Policy distinguishes requiring raw-material lines from allowing a report without them. Mix Percentage Validation Policy distinguishes an exact 100% total, a total within a configured tolerance, and no mix-total validation.

The mix-total rule applies to process strategies; quantity-based orders skip it. In Additive Let-down (Virgin Basis) mode, regrind lines are excluded from the summed mix percentages.

For the tolerance option, the validator rounds the summed mix percentages to two decimal places and compares against 100% ± Mix Percentage Tolerance Percentage. An illustrative tolerance of 2 permits totals from 98% through 102%; it is not a default.

Production Report Hours Validation Policy works with Maximum Reporting Hours. It compares Up Hours + Down Hours with the configured maximum, either as an upper limit or an exact total. The unrestricted choice omits those policy checks. Read the report’s productive and downtime hours together before changing a value to resolve a message.

Output Level Validation Policy distinguishes enforcement, warning-only handling, and skipping the output-level check. At completion, a work-center policy overrides the module default; if neither is supplied, enforcement is used. Review the center’s effective policy, capacity, and reporting values alongside the report. The production-report explanation describes its quantity, weight, and time comparisons.

Keep consumption timing separate from costing​

Consumption Timing Strategy distinguishes work-order completion from manufacturing-order completion as the consumption point. Use that choice when reviewing whether material should already have been consumed for a completed operation.

Manufacturing Costing Strategy distinguishes planned/BOM estimates, raw-material-focused cost, and warehouse weighted-average material cost. Scrap-inclusive variants include scrap cost in their respective basis. Compare the chosen basis with the report’s applied material costs; a material-only basis is different from a total including labor and machine cost.

Read location and scheduling context​

The record references default pre-production, production, and production-output locations. Keep their stage roles distinct while comparing them with the warehouse used for the job.

Minimum Production Lead Time Days describes the lead-time floor used in production-date planning. Work In Progress Limit Policy distinguishes allowing scheduling during existing work from disallowing scheduling on a line with running work. Read scheduling conditions with the actual center/work-order plan, rather than inferring them from report hours.

Use work-order, production-report, and manufacturing-order explanations to interpret the affected records. This reference explains policies; it is separate from a setup-editing procedure.

FAQ​

Business questions​

When should I review manufacturing settings?​

Review the relevant policy when a production report’s material mix, reporting hours, output validation, costing, or consumption timing differs from your intended production practice.

How does consumption timing change the work?​

Consume Per Work Order consumes at work-order completion. Consume on Manufacturing Order Completion defers that consumption to manufacturing-order completion. Check the configured choice before interpreting consumption progress.

How do the cost-strategy families differ?​

Standard estimate uses planned/BOM cost; raw-material strategies focus on material rather than labor and machine cost; warehouse weighted-average strategies use warehouse material cost summaries. Scrap-inclusive choices also include scrap cost.

Technical questions​

How is the mix-percentage tolerance used?​

For process strategies, Strict To 100 Percent requires a 100% total; quantity-based orders skip the mix-total check. Additive virgin-basis mode excludes regrind lines from that total. Allow Close To 100 Percent compares the total, rounded to two decimals, with 100% plus or minus the configured tolerance. No Mix Percentage Validation skips that mix-total check.

Which hours are checked against Maximum Reporting Hours?​

The validator compares Up Hours + Down Hours. Must Not Exceed Maximum rejects a larger sum; Must Equal Maximum requires equality; No Hours Restriction omits those policy limits.

What do the default location references distinguish?​

Pre-production, production, and production-output location references describe different stages of material location context. Compare the selected locations with the applicable warehouse and task before treating them as interchangeable.