Update scrap regrind
Correct the saved definition of a scrap recovery order before confirming its conversion.
Open Manufacturing → Scrap Management → Scrap Regrind.
Prepare the source and recovery outputs
Have the declared process weight, source warehouse, item category, and source unit ready. For each recovered raw material, check its variant weight setup and intended mix percentage. The variant weight unit must be pounds or kilograms.
Confirmation needs source scrap stock and warehouse stock, scrap hold, and scrap locations. Creating or updating the form does not perform those stock movements.
Update scrap regrind
- Find the draft recovery order and choose Update. Check its warehouse and weight before changing values.
- Enter Total weight generated from the process, then select warehouse, Item category, and Item unit of measure.
- Add or review the raw-material lines. Select Raw material and check Quantity and Mix Percentage against the recovery outputs you intend.
- Enter each intended positive mix percentage explicitly. A blank or zero percentage is treated as 100%; do not use zero to exclude a line.
- Compare the declared weight, source context, and output lines, then choose Update order.
Check the saved order
Use Update to reopen the saved order and compare the weight, warehouse, category, unit, and output lines. Check the recovered quantities alongside the chosen variants and their weight units.
If a line does not calculate, inspect its item/variant and weight setup before proceeding. If the unit is rejected, correct the variant's weight unit to the intended pounds or kilograms setup. Before confirm, compare declared recovery weight with the source weight available in scrap hold.
Read the scrap weight order for conversion consequences and state meanings.
FAQ
Business questions
When should I use this task?
Use it to correct the weight, source selection, or output definition of a pending recovery order.
Does saving the draft put recovered material into stock?
No. Create order and Update order save the definition. The separate confirm action performs the conversion and stock-movement work.
Why distinguish scrap hold from recovered raw material?
Scrap hold is the source material awaiting disposition. The output lines identify the raw materials produced by recovery, which are moved from scrap into stock during completion.
Technical questions
What must be configured on the warehouse?
Confirmation requires the warehouse’s stock, scrap hold, and scrap locations. It also requires source scrap stock and raw-material output lines.
What should I check on each output line?
Check the selected raw material, its variant and weight setup, Quantity, and Mix Percentage. The variant weight unit must be pounds or kilograms for the recovery calculation.
How should I enter Mix Percentage?
Enter each intended positive percentage explicitly. The calculation treats a blank or zero percentage as 100%, so a zero value does not exclude a line from recovery.