A routing node in an operational line describes an operation in a linear production context. Read it when checking the operation’s resource, planned duration, consumed duration, and planned cost.
Identify the step and resource
The name and description identify the operation. Its work center and work center type references distinguish the individual production resource from its functional classification. Compare these references with the step whose time or cost you are reviewing.
Compare the planned and recorded values
Duration Minutes and Consumed Duration Minutes serve different purposes: one describes the duration plan, while the other records consumed duration. Keep them separate when reviewing progress. Planned Cost is the planned amount for the operation; it is not, by its label alone, an actual-cost total.
The record also includes Quantity Per Manufactured Unit. Read that value with the operation’s production context before comparing lines. A per-unit quantity is a different basis from the full production quantity.
Continue the record check
Use the work center to interpret the selected resource and the work center type for the classification. The routing explanation describes the overall operation strategy. Keep the operation identity visible while comparing these connected definitions.
FAQ
Business questions
What does this record represent?
It represents a routing operation positioned on an operational line, keeping its sequence context and production-resource information together.
How is it different from the full routing?
The routing describes the overall operation strategy. This record describes a particular operation in a linear production context.
What should I check before interpreting its time or cost?
Check the operation name, description, and work center or work center type so that the values belong to the production step you intend.
Technical questions
Which time values should I compare?
Read Duration Minutes alongside Consumed Duration Minutes to distinguish the planned duration from the duration recorded as consumed.
Does Planned Cost represent actual cost?
It is the planned amount on the operation line. Read it as a plan when comparing the line, rather than treating its label as an actual-cost total.
Which production resources can it reference?
It has work center and work center type references. The individual center and its functional classification answer different questions about the operation.