Skip to main content

Rework order

A rework order tracks defective production being corrected or scrapped. Read its product, quantities, inspection comments, and disposition description together before deciding what the record means for the affected goods.

Identify the affected production​

The product, variant, packaging, unit, and configured attributes identify the goods. Inspection comments give context from the inspection that created the rework. The manufacturing reference links the record to the production being corrected; sales quote/order references preserve related customer context where present.

Compare the affected item configuration and quantities with the inspection. Similar product names do not establish that two rework records concern the same production.

Keep scope, processing, and recovery distinct​

Initial Quantity is the original scope; Quantity is the current disposition amount. Processed Quantity is updated by completion or scrap, so it does not by itself mean all processed goods were recovered successfully. Read it with the state and the action’s description.

Material lines show planned quantities and consumed quantities where recorded. Keep those material measures separate from the quantity of defective finished goods being disposed of. Cost Per Unit holds the cost set when the inspection creates the rework record; it is a different measure from a new production plan’s total cost.

Interpret the disposition​

The record lists Draft, Open, In Progress, Completed, Cancelled, and Scrapped. Completion and scrap have different consequences:

  • Completing rework records the rework description, creates inspection work, and moves the goods from rework to quality assurance.
  • Scrapping creates a replacement manufacturing order in Draft, moves the affected goods from rework into scrap hold, and records the scrap disposition.

Where only part of the original scope is processed, the logic can create a linked Draft child rework order for the remainder. Check both records before treating the entire original scope as resolved.

Choose the disposition task​

Open Manufacturing → Operations → Rework Orders. Complete rework order when the correction is ready for post-rework inspection. Scrap rework order when the disposition is scrap and replacement production is needed.

FAQ​

Business questions​

What does a rework order represent?​

It tracks defective output being corrected or scrapped, retaining the product and inspection context for that disposition.

Does completing rework release it directly as usable stock?​

Completion creates post-rework inspection work and moves the goods from the rework location to quality assurance. Check the inspection outcome before treating the goods as released.

What happens when rework is scrapped?​

The scrap action creates replacement manufacturing demand, moves the affected goods into scrap hold, and marks the rework record Scrapped.

Technical questions​

Which quantities should I distinguish?​

Initial Quantity describes the original rework scope. Quantity describes the current disposition amount. Processed Quantity records the amount handled by the completion or scrap action, so it is not necessarily a successful recovery quantity.

What should I read with the inspection comments?​

Read product, variant, packaging/unit, initial/current quantities, and the rework or scrap description together with the inspection comments.

How can remaining work be represented after a partial disposition?​

The disposition logic can create a linked child rework order in Draft for a remaining balance. Check the child record as well as the parent’s terminal state.