A production report records what happened during production: the quantity produced, its weight, the raw materials used, scrap, and time. Use it to reconcile a shift's results with its work order and to check the quantities and costs before completion posts the production activity.

Open Manufacturing → Operations → Production Reports, then choose View details for the report. Report numbers use the PR prefix.

Identify the work being reported​

Read the report number together with its date, product, work order, work center, and shift. These identify the production activity you are checking. The manufacturing order supplies the product, variant, packaging, unit of measure, and warehouse context; the work order connects that order to the work center performing the work.

Keep the report's quantity separate from Manufacturing Order Quantity. The latter records the manufacturing order quantity brought into the report calculation. It is context for the report, rather than proof of the order's remaining balance now. Check the manufacturing order itself when deciding how much work remains.

Reconcile quantity and weight​

Quantity, packaging quantity, and weight describe different aspects of the same output. Check the packaging and units before comparing their numbers.

InformationHow to read it
Packaging quantityThe number of packages reported. The package definition supplies the quantity per package.
QuantityPackaging quantity multiplied by the package definition's quantity. Read it in the report's unit of measure.
Planned WeightReported quantity multiplied by the product variant's weight per unit. This is the expected weight of this report's output.
Actual Total WeightThe actual output weight entered for the report.
Total scrap weightWeight attributed to the reported scrap. Keep it separate from actual output weight.
WeightIn weight-based production, actual output weight plus total scrap weight.

For example, suppose you report 10 packages containing 20 units each, and the variant weighs 2 lb per unit. The report quantity is 200 units, and Planned Weight is 400 lb. If actual output weighs 390 lb and scrap weighs 10 lb, total Weight is 400 lb. The total can match the planned weight while usable output is still 10 lb below it. These are illustrative values, not defaults.

In weight-based production, Weight over/under compares actual output weight with planned weight. The percentage is (actual output weight − planned weight) ÷ planned weight × 100. In the example, this is −2.5%. Work center warning and error thresholds determine whether that difference needs attention or blocks validation.

For orders that calculate material consumption by quantity, material quantities drive consumption. Weight is informational, and the calculation clears the weight-based scrap totals. Check which consumption approach the manufacturing order uses before interpreting a zero scrap total.

Read time and output together​

Up Hours records productive time. Down Hours is the sum of the hours in the downtime lines. Read each downtime duration with its reason and description so you can understand what interrupted the work.

The report's actual output rates include both productive time and downtime:

  • Actual Output Per Hour = quantity ÷ (Up Hours + Down Hours).
  • Actual Output Weight Per Hour = total Weight ÷ (Up Hours + Down Hours).

For example, 800 units produced over seven productive hours and one downtime hour give 100 units per hour. Dividing by seven would answer a different question and would not match this report's actual output rate.

Planned Output Per Hour comes from the work order. Output Level checks reported output against the work center's configured capacity for the productive hours. That capacity check uses Up Hours, so read the flag separately from the report's average output rate. Its validation policy and thresholds affect whether an exception warns or prevents completion.

Trace materials, scrap, and downtime​

Raw material lines identify the ingredients or components reported for consumption. Read the product and variant with their lot, warehouse, location, quantity, and unit of measure. These connections let you trace which inventory supplied the production, rather than relying on a product name alone.

For weight-based production, material mix percentages and the work center's blending approach affect the calculated consumption. Scrap lines contribute the reported loss, while their reasons explain why it occurred. For example, the scrap reasons distinguish startup waste, equipment failure, and quality samples. A quantity tells you the size of the loss; its reason and description make the loss useful for investigation.

Where weight-based scrap or downtime is reported, the corresponding lines need a reason code and description. Check those details alongside the totals before confirming. Manufacturing settings also control material and mix-percentage validation, so do not assume every report must use the same mix tolerance.

The report can also be referenced by production inspections and raw material inspections. Use those records to investigate the related quality work. A report's completion status by itself does not explain the outcome of an inspection.

Check the cost breakdown​

Read the applied material cost with the quantity that produced it. A raw material line's Applied Cost Per Unit is the cost selected by the costing strategy. The line also retains standard, batch, and weighted average cost information, which provides different cost perspectives on the same material.

The production report totals use the applied costs:

TotalCalculation
Cost Of Raw MaterialSum of the raw material lines' Applied Total Cost. Each line is quantity × Applied Cost Per Unit.
Cost Of ScrapSum of the raw material lines' Applied Total Scrap Cost. Each line is scrap quantity × Applied Cost Per Unit.
Cost Of Labor(Up Hours + Down Hours) × Cost Of Labor Per Hour. The hourly rate comes from the work center.
Total CostCost Of Raw Material + Cost Of Scrap + Cost Of Labor.

For example, applied material cost of 500, scrap cost of 20, and eight total hours at 30 per hour give labor cost of 240 and Total Cost of 760, in the same currency. Use the applied totals when reconciling Total Cost; adding the standard, batch, and weighted average totals together would count alternative valuations as extra consumption.

Check the report before completion​

Before you confirm a report, compare these values with the production records you are reconciling:

  1. Match the work order, product, variant, packaging, and warehouse to the work actually performed.
  2. Reconcile package count to quantity, and planned weight to actual output and scrap. Investigate an unexpected weight difference before treating it as production performance.
  3. Add the downtime lines and compare their total with Down Hours. Up Hours must be greater than zero; the configured hours policy may require total hours to equal, or stay within, the reporting limit.
  4. Check each material lot and unit of measure against the material used. Insufficient lot stock can prevent the calculation from succeeding.
  5. Reconcile the applied material, scrap, and labor totals. Review the reasons for scrap and downtime with the person responsible for the shift when the totals need explanation.

These comparisons help you review the report. The arithmetic examples above do not replace the product's validation policies or establish that an unflagged report is correct.

Understand completion and connected work​

Draft identifies a newly created report. Completed is the posting checkpoint: completion recalculates the report, creates time tickets for productive time and downtime, processes the reported material and scrap movements, and credits produced quantity to the manufacturing order. Material consumption moves stock to the production location; reported scrap moves stock to the scrap hold location.

Completion separates output that satisfies remaining demand from excess output. The manufacturing order’s Quantity Completed then totals the full quantities of its Completed reports, including surplus; remaining demand is floored at zero and excess appears as Overproduction. Check both the output movements and the order’s saved totals when reconciling a report.

Use Update to review and change the report through its update panel before completing the production activity. Use the confirm action after the report's quantities, time, materials, and reasons are ready for completion. Use View details when investigating a saved report; its material, scrap, downtime, and attachment sections keep supporting information together. Attach File provides an attachment action for completed reports.

When tracing a completed report, follow its time tickets for the recorded time and its inventory movements for stock effects. The report supplies the shared production context for those records; their own details explain the individual time or movement entries.

FAQ​

Business questions​

What does a production report tell me that the work order does not?​

The production report records the declared results: output quantity and weight, material consumption, scrap, and time. Its work order identifies the work and work center behind those results. Read them together when comparing the production activity with the planned work.

When does the report affect inventory and the manufacturing order?​

Completion processes the material and scrap movements and credits the produced quantity to the manufacturing order. Check for Completed, then review the connected movements and the manufacturing order's balance when reconciling the posting.

Why should I review scrap reasons as well as the total scrap weight?​

The total tells you how much was lost; the reasons distinguish losses such as startup waste, equipment failure, and quality samples. Read each reason with its description when deciding which loss needs investigation.

Technical questions​

Why can total Weight match Planned Weight while actual output is lower?​

In weight-based production, total Weight includes actual output weight plus scrap weight. Planned Weight is reported quantity multiplied by the variant's unit weight. Compare actual output with Planned Weight separately so scrap does not hide a shortfall in usable output.

Does Actual Output Per Hour include downtime?​

Yes. It divides quantity by Up Hours plus Down Hours. For example, 800 units over seven productive hours and one downtime hour give 100 units per hour. The work center capacity check for Output Level uses productive hours, so it is a separate comparison.

Which costs make up Total Cost?​

Total Cost adds applied raw material cost, applied scrap cost, and labor cost. Labor uses Up Hours plus Down Hours at the work center's hourly rate. Use the applied line totals for reconciliation; standard, batch, and weighted average amounts are alternative cost information.