Update routing strategy
Correct the identifying information or product scope of an existing strategy.
Open Manufacturing → Planning & Definition → Routings.
Prepare the strategy’s scope
Have the strategy name, finished item, intended variants, and description ready. Use the description to explain which production approach this strategy represents when an item has alternatives.
This form defines the strategy header. Operation nodes and their connections are handled separately through Route planning.
Update routing strategy
- Find the intended strategy and choose Update. Compare its current item and variant scope before making changes.
- Enter Strategy name and select the finished item.
- Review Variant against the intended product configuration.
- Enter Strategy description, then compare the name, product, and scope with the intended definition.
- Choose Update strategy.
Check the result
Find the saved strategy and reopen Update. Compare its name, item, variants, and description with the definition you intended. Correct a mistaken item or variant selection before using the strategy for production.
Read the routing record for operation connections and duration meanings. Saving the header and planning the operation network are separate jobs.
FAQ
Business questions
When should I use this task?
Use it to correct the existing strategy’s name, product scope, or description.
How does it differ from a bill of material?
The BOM describes component requirements; the routing describes the operations used to produce the item.
Does saving the strategy header define all its operations?
Saving the name, item/variants, and description stores the strategy definition. Route planning is a separate activity for its operation nodes and connections.
Technical questions
Which values identify the strategy’s product scope?
Read item and Variant together. Compare the chosen finished product and intended variants before using the strategy.
What should the name and description explain?
They should identify the strategy and the production approach it represents, especially where the same item has alternatives.
How do I verify the saved definition?
Reopen Update and compare the stored name, item, variant scope, and description with the intended strategy.