Create bill of material
Define the materials for another finished-item recipe.
Open Manufacturing → Planning & Definition → Bill of Materials (BOM).
Prepare the recipe
Have the finished item/variant, recipe output quantity, component items/variants, quantities, and units ready. Check the component variants and standard costs so that the planned line costs can be evaluated.
A recipe for 10 finished units is a different quantity basis from a recipe for one. Compare the component quantities against that output basis before saving.
For Quantity consumption strategy, use Calculate By Percentage for a mass-based formulation, Calculate By Percentage And Quantity to establish the formulation and then scale its quantities proportionally on manufacturing orders, or Calculate By Quantity for counted component requirements. Read the strategy comparison before choosing.
Create bill of material
- Choose Create Bill of Material.
- Enter Name and Description, then select the finished item and Variant.
- Enter Quantity of items manufactured as the recipe's finished-output basis.
- Add or review the component lines. Select Raw material and compare Quantity, Percentage Mix, and Unit of Measure with the recipe.
- Review Quantity consumption strategy and the resulting component values. Resolve line messages about missing variants or invalid costs.
- Choose Create BoM.
Check the saved recipe
Use Details to inspect the saved definition. Compare the finished item/variant, output basis, and each component's quantity/unit with the recipe you intended. Check planned line cost against standard unit cost × component quantity.
If a component variant is missing, inspect that item's variant setup. If its cost is zero or invalid, correct the standard cost and recheck the line. Saving a definition and recording actual production consumption are different jobs.
Read the bill of material for quantity, cost, and record interpretation.
FAQ
Business questions
When should I use this task?
Use it for a separate finished-item recipe with its own component definition.
How does it differ from a routing?
The BOM describes material requirements. A routing describes production operations. Manufacturing orders can refer to both definitions.
What should I compare before saving?
The BOM has finished-item and variant references. Check that those match the product configuration whose material requirements you need.
Technical questions
How should I compare the recipe quantity and component quantities?
Use the finished recipe quantity as the comparison basis. For example, 20 kilograms for 10 finished units is 2 kilograms per unit as a manual reasonableness check; these are illustrative values.
Where does a component’s planned cost come from?
The calculator takes the component variant’s standard unit cost, rounds it to five decimal places, and multiplies it by the component quantity for line planned cost.
What should I check when a component line has a cost or variant error?
Verify that the selected variant exists and has a finite, nonzero standard cost. Correct its item/variant setup, then recheck the line before using the BOM.