Bill of Materials (BOM)
Use the BOM definition to describe the material needed for a finished item. Check the recipe before using its requirements on a manufacturing order.
Open Manufacturing → Planning & Definition → Bill of Materials (BOM).
Define or correct the recipe
Create bill of material for a separate definition. Update bill of material to correct an existing one. Match the finished item and variant first, then compare the recipe output quantity with the raw-material quantities and units.
The quantity basis matters: a component quantity for 10 finished units must not be read as a per-unit requirement. Use the record explanation for component cost and quantity checks.
Check the material plan
Review Quantity consumption strategy, line Quantity, Percentage Mix, and Unit of Measure together. Inspect missing-variant or invalid-cost messages before relying on the calculated component values. Planned cost is a material-plan measure, while actual consumption is recorded during production work.
Continue with production planning
Use the saved definition to identify the material plan appropriate to the manufacturing order. Compare the selected item/variant and recipe basis with the production quantity. Keep routing operations separate from the material recipe when reviewing how the work will be performed.
FAQ
Business questions
What does a bill of material describe?
It defines the components and quantities for producing a finished item. Read the finished item and recipe quantity alongside the component lines.
How does it differ from a routing?
The BOM describes material requirements. A routing describes production operations. Manufacturing orders can refer to both definitions.
Why check the finished-item variant before using a BOM?
The BOM has finished-item and variant references. Check that those match the product configuration whose material requirements you need.
Technical questions
How should I compare the recipe quantity and component quantities?
Use the finished recipe quantity as the comparison basis. For example, 20 kilograms for 10 finished units is 2 kilograms per unit as a manual reasonableness check; these are illustrative values.
Where does a component’s planned cost come from?
The calculator takes the component variant’s standard unit cost, rounds it to five decimal places, and multiplies it by the component quantity for line planned cost.
What should I check when a component line has a cost or variant error?
Verify that the selected variant exists and has a finite, nonzero standard cost. Correct its item/variant setup, then recheck the line before using the BOM.