Bill of Materials (BOM)

Use the BOM definition to describe the material needed for a finished item. Check the recipe before using its requirements on a manufacturing order.

Open Manufacturing → Planning & Definition → Bill of Materials (BOM).

Define or correct the recipe​

Create bill of material for a separate definition. Update bill of material to correct an existing one. Match the finished item and variant first, then compare the recipe output quantity with the raw-material quantities and units.

The quantity basis matters: a component quantity for 10 finished units must not be read as a per-unit requirement. Use the record explanation for component cost and quantity checks.

Check the material plan​

Review Quantity consumption strategy, line Quantity, Percentage Mix, and Unit of Measure together. Inspect missing-variant or invalid-cost messages before relying on the calculated component values. Planned cost is a material-plan measure, while actual consumption is recorded during production work.

Continue with production planning​

Use the saved definition to identify the material plan appropriate to the manufacturing order. Compare the selected item/variant and recipe basis with the production quantity. Keep routing operations separate from the material recipe when reviewing how the work will be performed.

FAQ​

Business questions​

What does a bill of material describe?​

It defines the components and quantities for producing a finished item. Read the finished item and recipe quantity alongside the component lines.

How does it differ from a routing?​

The BOM describes material requirements. A routing describes production operations. Manufacturing orders can refer to both definitions.

Why check the finished-item variant before using a BOM?​

The BOM has finished-item and variant references. Check that those match the product configuration whose material requirements you need.

Technical questions​

How should I compare the recipe quantity and component quantities?​

Use the finished recipe quantity as the comparison basis. For example, 20 kilograms for 10 finished units is 2 kilograms per unit as a manual reasonableness check; these are illustrative values.

Where does a component’s planned cost come from?​

The calculator takes the component variant’s standard unit cost, rounds it to five decimal places, and multiplies it by the component quantity for line planned cost.

What should I check when a component line has a cost or variant error?​

Verify that the selected variant exists and has a finite, nonzero standard cost. Correct its item/variant setup, then recheck the line before using the BOM.