Manufacturing order

A manufacturing order authorizes production of a finished item. Use it to check what you planned to make, how much has been produced, what remains, and how the work compares with its material and timing plan.

Open Manufacturing → Operations → Manufacturing Orders. The manufacturing order number uses the MO prefix. Use that number when discussing the same production commitment with planning, the shop floor, and the warehouse.

Identify the product and the work​

Start with the product, variant, unit of measure, and packaging. Read these together before comparing quantities: 100 individual units and 100 packages describe different amounts of production. The order also connects to a warehouse and work site. Check those references when establishing where the work belongs.

The manufacturing order brings together two parts of the production plan:

  • The bill of materials (BOM) identifies the component items and quantities needed for the finished item.
  • The routing describes the sequence of operations. Its operation information connects the work to work centers, material requirements, and work instructions.

A work order is the instruction for an operation under the manufacturing order, scheduled on a work center. A production report records produced quantity, scrap, and downtime against a work order. Read the manufacturing order for the overall commitment; examine its connected work orders and production reports when you need to understand a particular operation or reported result.

Where an account, sales quote, or sales order is linked, use it to trace the commercial context of the production commitment. These references help you identify the demand being served.

Read the quantities together​

Ordered Quantity records the order’s demand baseline. A partial quantity move reduces this value on the original order and creates a new Draft order for the split amount; use the saved baseline when reconciling progress. The order's Quantity is the remaining quantity after production reconciliation. Quantity Completed is the total produced quantity from completed production reports. A saved report that is still a draft is outside that completed-report total.

After reconciliation, the quantities relate as follows:

ValueHow to interpret it
Ordered QuantityThe recorded demand baseline, reduced when demand is split into another order.
Transferred QuantityQuantity transferred from this manufacturing order to another.
Quantity CompletedThe sum of quantities on completed production reports for this order.
QuantityThe recorded ordered quantity, less transferred quantity and completed quantity, with a minimum of zero.
Overproduction QuantityProduced quantity above the recorded ordered quantity less transferred quantity.
Percentage CompletedQuantity Completed ÷ Ordered Quantity × 100.

The percentage uses the saved Ordered Quantity baseline. After a partial quantity move, that baseline is lower. The remaining balance also accounts for transfers, so a zero balance does not necessarily mean the percentage is 100%.

For example, an order starts at 1,000 units, with 200 units transferred to another order and completed production reports totaling 600 units. The remaining quantity is 1,000 − 200 − 600 = 200 units, and completion is 600 ÷ 1,000 × 100 = 60%. If completed reports later total 800 units, this order has no remaining quantity while its percentage is 80%. This example interprets a saved Transferred Quantity; a partial Move Order is a different change that reduces Ordered Quantity itself.

When production exceeds the quantity still assigned to the order, the remaining quantity stays at zero and the excess is recorded as overproduction. Read the overproduction quantity alongside completed quantity when reconciling output.

Interpret the order's status​

Read status alongside the quantities and connected work. It tells you the state of the order; the percentage tells you how reported output compares with the saved Ordered Quantity baseline.

StatusMeaning
DraftA draft manufacturing order.
OpenThe manufacturing order has been confirmed.
In ProgressAt least one work order has started, or stock has been consumed.
CompletedThe order has been completed, including completion of its outstanding work orders.
CanceledThe manufacturing order has been canceled.

An order can also be ended early while it is In Progress. This requires a reason and completes outstanding work orders before marking the order Completed. Check the finalization reason and production quantities when a completed order has produced less than the original ordered quantity. Early completion does not turn the unproduced quantity into output.

Check material requirements and consumption​

The planned BOM lines show the material plan for this order. At an operation, Quantity Per Unit tells you how much of a component is needed for one finished unit. Total Quantity Required is the manufacturing quantity multiplied by that per-unit quantity. Quantity Remaining is the total required quantity less the quantity already consumed.

For example, a requirement of 0.25 kg per finished unit for 400 finished units gives 400 × 0.25 = 100 kg required. If 30 kg has been consumed at that operation, the remaining material requirement is 100 − 30 = 70 kg. This is a material requirement check; it does not establish how much stock is available in the warehouse.

To investigate actual usage, distinguish the consumption detail from its summary:

  • Consumed Bill of Material Lines contains the raw materials consumed through production reports and work orders.
  • Actual Bill of Material Lines summarizes consumption in groups by item, variant, unit of measure, and identified stock. Separate lots can therefore remain separate summary lines.

Match the item, variant, and unit of measure before comparing actual consumption with a planned line. The consumption variance labels help you read that comparison:

LabelMeaning
OverusedMore was consumed than planned.
UnderusedLess was consumed than planned.
MatchedConsumption equals the plan.
UnplannedThe consumed material has no matching planned BOM line.

Use an unexpected label as a reason to inspect the consumption detail and its related production work. A difference identifies something to explain; it does not by itself establish the cause.

Compare the schedule and recorded cost​

The planned start and end dates correspond to the first and final work orders in the plan. Actual start and end dates come from the first and last work orders. Compare each actual date with its planned counterpart to see where timing changed. An actual end date describes recorded work timing; read the status separately to establish whether the order is completed.

Keep elapsed calendar time separate from Actual Minutes, which records the time spent on the manufacturing order. A period between start and end dates can include time outside recorded production activity.

Draft reconciliation resets planned weight and planned cost totals to zero. A zero Draft cost is not an estimate that production will be free; check the state and recalculate/review the production plan before using costs for a commitment.

For a cost review, compare like amounts in the same currency. Read Planned Raw Material Cost beside Cost Of Raw Material, and Planned Labor Cost beside Cost Of Labor. Use the material detail to investigate a material difference and the connected production work to investigate labor and time. These comparisons help locate a difference before you examine the overall Total Cost or Cost Per Unit.

An order can also belong to a subassembly structure. Its parent manufacturing order identifies the order whose BOM requirement it fulfills; the root manufacturing order identifies the top of that structure. Check those references when deciding whether you are reviewing a component's production or the finished item's overall production.

Review the record before the next action​

Use this reading order before confirming a plan, investigating a production difference, or discussing completion:

  1. Match the manufacturing order number, product, variant, unit, packaging, warehouse, and work site to the work you mean to review.
  2. Check the selected BOM and routing together: the component plan and operation plan answer different questions.
  3. Reconcile ordered, transferred, completed, and remaining quantities. Check completed production reports when the output total needs explanation.
  4. Read status and any early-finalization reason alongside those quantities.
  5. Compare planned and actual work dates, then inspect material consumption and recorded costs where the result differs from plan.

These are review comparisons you make from the record. Use Manufacturing Orders for the order's actions, Work Orders for operation detail, and Production Reports for reported production. When tracing warehouse activity, follow the stock movement's manufacturing order reference to keep that activity tied to the same order.

FAQ​

Business questions​

How does a manufacturing order differ from a work order?​

The manufacturing order authorizes production of the finished item and brings together its quantities, material plan, and operations. A work order is an operation instruction under that order, scheduled on a work center. Use the manufacturing order for the overall commitment and the work order for the operation being performed.

Why does the order have both a BOM and a routing?​

They describe different parts of the plan. The BOM identifies component items and required quantities. The routing describes the operation sequence. Check both when deciding whether the order represents the production work you intend.

How can I judge whether production ran to its planned dates?​

Compare Actual Start Date with Planned Start Date, and Actual End Date with Planned End Date. The planned dates correspond to the first and final planned work orders; actual dates come from the first and last work orders. Read the order's status as well, because recorded timing and completion state answer different questions.

Technical questions​

Why can the remaining quantity be zero while completion is below 100%?​

The remaining quantity accounts for transfers to other orders, while Percentage Completed uses the saved Ordered Quantity baseline. For a saved baseline of 1,000 units with Transferred Quantity of 200 and 800 produced, the remaining quantity is zero and completion is 80%. A partial Move Order instead reduces the saved ordered baseline.

What do Overused and Underused tell me about a material line?​

They compare consumption with the planned BOM quantity: Overused means more was consumed, and Underused means less was consumed. Match the item, variant, and unit of measure, then inspect the consumption detail to explain the difference. The label does not identify the cause.

Can a completed order still show production below the original ordered quantity?​

Yes. Transferred quantity can reduce the production still assigned to the order, and an In Progress order can also be ended early with a reason. Check transferred quantity, completed quantity, and the finalization reason before interpreting Completed as fulfillment of the original quantity.