Complete work order
Complete a work order when its operation is ready to close and its saved production information is correct. Completion records the operation as Completed, applies its completion quantities, and processes material consumption according to the manufacturing settings. It can also create in-process quality inspections.
This task closes an operation. Continue to use production reports for reporting produced finished-goods quantities against the manufacturing order.
Check readiness before completing
Open Manufacturing → Operations → Work Orders. Match the Work order, Manufacturing order, and Work Center to the operation you intend to close.
The complete action appears for Draft, Open, and In Progress work orders. A work center must be assigned. When material consumption is handled at each work order, the production work order and its manufacturing order must be Open or In Progress for that consumption to proceed. A Draft row's visible action does not establish that it passes the material-consumption checks.
Check earlier operations where the routing requires them:
- If the work start rule says Do not allow start until previous work order is completed, its predecessor work orders must be Completed.
- If input parts come exclusively from the previous step, that step must have produced enough of each required input part. Completing a predecessor's status alone does not establish that its output quantity covers this operation's requirement.
For stock-sourced inputs, check the intended material supply instead. A shortage can prevent completion. The manufacturing order's warehouse must have the required stock and production locations configured when consumption occurs at work-order completion.
Review what completion will record
Choose the row's complete action to open Review and Complete Work Order. Check the Work order and Manufacturing order references first. Total time (min) describes the time between the work order's start and end; it is separate from the quantities being reviewed.
Read each part group against its Total quantity required:
| Group | What to compare |
|---|---|
| Input parts | Input part name and Quantity consumed identify the parts used by this operation. |
| Output parts | Output part name and Quantity Produced identify what this operation produces for subsequent work. |
| Raw material | Raw material and Quantity consumed identify the material used at this step. |
Completion uses the work order's saved quantities. Do not rely on edits made only in this review panel to correct those saved quantities. Resolve a mismatch in the production records before returning to complete the operation.
Review zero values with particular care. Completion fills an input part or raw material's zero consumed quantity with its total required quantity. It also fills an empty or zero output produced quantity with that output's total required quantity. A zero therefore does not mean “record no production or consumption.”
Existing nonzero consumption is retained. For example, if a material requires 100 units and saved consumption is zero, completion fills consumption to 100 units. If saved consumption is 40 units, completion retains 40 and calculates 60 remaining. These illustrative figures show why Completed alone does not prove that every material was consumed in its full planned quantity.
Completion also fills a work instruction's zero actual duration with its total duration. Check the recorded work before accepting planned amounts as completion amounts.
Complete the operation and check the result
Before committing, account for the material and quality effects. With consumption at each work order, completion processes additional material consumption and creates the associated stock-to-production movements. If manufacturing settings defer consumption until manufacturing-order completion, this action skips that work-order consumption. Input parts may be supplied by predecessor output or stock according to the routing's picking strategy.
Active in-process quality control points linked to the work order's instructions can create inspection records. An unresolved inspection covered by a blocking control point can prevent further inspection creation for the same manufacturing order.
- Confirm that the saved quantities, earlier-operation results, work-center assignment, and material supply are ready.
- In Review and Complete Work Order, choose complete. The button shows Completing while the action runs.
- Check for Work order successfully completed., then locate the same work order in the list and check Status: Completed.
- Choose Details. In Work Order details, check Work order status and review Actual raw material cost and Actual total cost against the production you intended to close.
Completion changes an Open parent manufacturing order to In Progress. It does not finish that manufacturing order or establish that its original quantity has been produced. Use the manufacturing order to review the overall balance and status.
Resolve a blocked completion
Use the message to identify the affected record, then recheck the work order before retrying.
| Problem | What to do next |
|---|---|
| No associated work center | For a Draft or Open order, use Update, select Work Center, and save with Update Work Order. Reopen the completion review. If the order is already In Progress, have the production planner resolve its assignment before completing it. |
| Dependencies must be completed | Find the predecessor work orders under the same manufacturing order and complete the required earlier operations first. |
| An input part requires more than the upstream output produced | Check the named input's requirement against its predecessor's output. Finish or correct the upstream production record before retrying. |
| No stock or insufficient stock | Check the item, lot, warehouse, and source location named in the message with the inventory team. Arrange the needed supply or correct the production record, then review completion again. |
| Missing warehouse, stock location, or production location | Have the warehouse configuration corrected for the manufacturing order before retrying material consumption. |
| A pending in-process inspection must be completed | Resolve the named inspection through the quality team. Check the work order's current status before trying the completion action again. |
If completion reports an error, inspect the current record before retrying; the message alone does not describe the final state of every connected record. Keep the work order number with the error when asking the production, inventory, or quality team to investigate.
FAQ
Business questions
Does completing a work order finish the manufacturing order?
No. It completes the operation and changes an Open parent manufacturing order to In Progress. Check the manufacturing order's own quantities and status for the overall production commitment, and use production reports to report finished-goods production.
Does completion always consume materials immediately?
Consumption timing depends on the manufacturing settings. When consumption is handled at each work order, this action processes additional material consumption. When consumption is deferred until manufacturing-order completion, the work-order action skips that consumption. Check the configured timing when reconciling inventory effects.
Can completing an operation create quality work?
Yes. Work instructions matched to active in-process quality control points can create inspection records. An unresolved inspection linked to a blocking control point can prevent further inspection creation for the same manufacturing order; resolve the named inspection before proceeding.
Technical questions
Can I leave a quantity at zero to record that nothing was consumed or produced?
No. Completion fills zero input and raw-material consumption with the required quantities, and fills empty or zero output production with the required output. Check the saved production record before completing if zero is intended to mean no activity.
Why can an earlier operation block completion?
The work start rule can require predecessor work orders to be Completed. Separately, input parts sourced exclusively from the previous step need enough matching upstream output. Check both the predecessor's status and its produced quantity.
How do I correct a missing work-center assignment?
A work center must be assigned before completion. For a Draft or Open work order, choose Update, select Work Center, and save with Update Work Order. Reopen the completion review and check the assignment. If the order is already In Progress, have the production planner resolve the assignment before completing it.