Scrap rework order
Scrap a rework order to move the affected goods into scrap hold and create replacement manufacturing demand. Read those consequences before committing the disposition.
Open Manufacturing → Operations → Rework Orders.
Check the goods and source context
Compare product, variant, quantity, and Quality control notes with the goods being scrapped. The referenced manufacturing order, warehouse, item, and variant must exist. The warehouse needs a scrap hold location and the relevant rework movement context.
The list shows Scrap for Draft and Open rework records.
Scrap the order
- Use Details to establish the product and variant, then choose Scrap for the intended record.
- Check Rework Order Number, Initial quantity, Scrap quantity, and Quality control notes in the panel.
- Enter Scrap description to explain the disposition.
- Confirm the affected goods before choosing Scrap in the panel. The action creates a Draft replacement manufacturing order and moves the goods from rework into scrap hold.
Check the result
Use Details to check Scrapped and the processed amount. Review the replacement manufacturing order and the rework-to-scrap-hold movement. When the disposition leaves a remaining balance, inspect any linked Draft child rework order as well.
If the action reports a missing manufacturing order, warehouse, scrap hold location, item, or variant, inspect that reference before retrying. After an interruption, check the replacement and movement records before repeating the action.
Read the rework order for the difference between processed and successfully recovered quantities.
FAQ
Business questions
When should I scrap a rework order?
Use the scrap disposition when the affected goods are being removed from rework into scrap hold and replacement production is needed.
Does scrapping create replacement production?
Yes. It creates a Draft manufacturing order linked to the original manufacturing order for the scrapped quantity, carrying the product and production context.
Where do the affected goods go?
The action moves goods from the rework location into the warehouse’s scrap hold location. Scrap hold and released finished-goods stock serve different purposes.
Technical questions
When is Scrap shown?
The Rework Orders list shows Scrap for Draft and Open records.
What should the Scrap description explain?
Describe the scrap disposition for the displayed goods, using the inspection notes and product/quantity context to identify what is being removed.
What should I check after the action?
Check Scrapped and Processed Quantity, the rework-to-scrap-hold movement, the replacement Draft manufacturing order, and any Draft child rework order for a remaining balance.