Skip to main content

Rework Orders

Use Rework Orders to decide the disposition of defective production: return corrected goods to quality assurance or scrap them and create replacement production demand.

Open Manufacturing → Operations → Rework Orders.

Identify the affected goods​

Open Details and compare product, variant, packaging/unit, quantities, and inspection comments. Read the original scope separately from the current disposition amount. The record explanation distinguishes initial, processed, and recovered quantities.

Choose the supported disposition​

Complete rework order when corrected goods are ready for post-rework inspection. The complete action is shown on Draft records and moves goods from rework to quality assurance while creating inspection work.

Scrap rework order when the disposition is scrap. The Scrap action is shown on Draft/Open records; it creates replacement manufacturing demand and moves the affected goods into scrap hold.

Check resolution and any remainder​

After either disposition, compare the terminal state, processed amount, and resulting movement with the goods handled. Completion also needs an inspection check; scrap needs a check of the new Draft replacement manufacturing order.

A linked Draft child rework order can carry a remaining balance. Review that child rather than assuming the parent’s Completed or Scrapped state resolves every unit in the original scope.

FAQ​

Business questions​

What does a rework order represent?​

It tracks defective output being corrected or scrapped, retaining the product and inspection context for that disposition.

Does completing rework release it directly as usable stock?​

Completion creates post-rework inspection work and moves the goods from the rework location to quality assurance. Check the inspection outcome before treating the goods as released.

What happens when rework is scrapped?​

The scrap action creates replacement manufacturing demand, moves the affected goods into scrap hold, and marks the rework record Scrapped.

Technical questions​

Which quantities should I distinguish?​

Initial Quantity describes the original rework scope. Quantity describes the current disposition amount. Processed Quantity records the amount handled by the completion or scrap action, so it is not necessarily a successful recovery quantity.

What should I read with the inspection comments?​

Read product, variant, packaging/unit, initial/current quantities, and the rework or scrap description together with the inspection comments.

How can remaining work be represented after a partial disposition?​

The disposition logic can create a linked child rework order in Draft for a remaining balance. Check the child record as well as the parent’s terminal state.