Production Schedule

Production Schedule shows work orders across time, grouped by work center. Use it to review planned operations, locate a job that needs adjustment, and check the effect of a scheduling change.

Open Manufacturing → Operations → Production Schedule. Have the work-order or manufacturing-order number and intended production resource ready.

Locate the resource and operation​

The resource panel identifies Work Center. The timeline uses each work order’s number, start date, end date and status. Narrow resource rows by Work Center, Work site, or work-center Status. Narrow tasks by Start date, Status, or Work Order Number.

Read the operation’s status alongside its dates. Draft, Open, In Progress and Completed have different colors, but the status and Details provide the record context. Confirm the parent manufacturing order and requirements before changing a similar-looking operation.

Review or adjust the plan​

Use task Details for Draft/Open/In Progress/Completed work orders. Task Edit is available for Draft/Open; follow Update work order for the center/date inputs, dependency checks and saved-result comparisons.

After an edit, inspect the saved operation and related Draft/Open work in the same manufacturing order. A date change or center move can shift related operations. Compare the old and new centers when moving a job.

For example, if a downstream operation requires its predecessor to finish, compare its proposed start with that predecessor’s end before editing. The update can reject an earlier start.

Use reflow with a wider checkpoint​

Reflow Work Orders recalculates the production schedule across eligible work orders, rather than just the row you are viewing. It considers non-completed work orders whose start or end is today or later and requires active work centers. Work with saved start/end dates whose start is at or before the current time is held at its existing slot, regardless of status. Maintenance work is also held at its existing slot.

Before using it, review center assignments and the work that is already underway. After it finishes, compare the resulting dates across affected resources and dependent operations. The reflow uses daily work-center start/end hours when recorded; otherwise its default is every day, 00:00–24:00. It does not read Work Shifts. Inspect the actual maintenance slots and saved dates when checking the result.

If no active centers are available or a work order refers to an unavailable center, review the center assignments before retrying. A success message is followed by checking the saved schedule.

Report actual work through the reporting task​

The header offers Create production report and Create PR by quantity. Use the standard report task, or the quantity-reporting task for orders already using that calculation method.

Saving or moving a scheduled operation and reporting actual production are separate actions. Use the Production Report Calendar to inspect recorded report dates.

FAQ​

Business questions​

What should I use this schedule to decide?​

Use it to locate work by resource and date, inspect the operation context and determine whether a supported center/date change or wider schedule review is needed.

When is reporting production a separate task?​

When recording actual output and time. Use Create production report, or Create PR by quantity for an order already using quantity-based calculation.

Why review the wider plan after reflow?​

Reflow considers eligible work orders across the schedule. Review affected resources and dependent operations after it saves new dates.

Technical questions​

Which filters help locate a work order?​

Task filters include Start date, Status and Work Order Number. Resource-row filters include Work Center, Work site and Status.

When can I edit a task?​

Edit is shown for Draft and Open work orders. Use the update task and compare saved dates afterward because related operations may move.

What distinguishes this view from the report calendar?​

Production Schedule uses work-order start/end dates. Production Report Calendar uses report creation and completion dates, so the two views answer different timing questions.