Update production report

Update a saved production report when its recorded output, time, material lot, scrap, or explanation needs correction. The update recalculates and validates the report, then saves the changes to the same PR record.

Check that the report is ready to edit​

Open Manufacturing → Operations → Production Reports and identify the report by its PR number, work order, product, and shift. The row's Update action is shown for Draft and Confirmed reports.

For a Completed report, the table offers Attach File for supporting files. Use that separate action when adding evidence to completed production. It is separate from the report-value update described here.

Have the corrected run information available before editing. Open View details if you first need to compare the saved report with the run sheet or shift record. Use Create production report when recording a different run; use this update to correct the existing report.

Saving an update recalculates the whole report, including material quantities, weights, output rates, and costs. This happens even when the intended correction is a comment or description. Review the calculated values before saving. Updating the report is separate from confirmation, which completes production and posts time, inventory, and manufacturing-order effects.

Correct the run information​

  1. Choose Update for the report. The Update production report form opens with its saved information.

  2. Check Work order and Manufacturing Date. Correct the work order only when the report belongs to different work. After changing it, review the displayed Manufacturing order, Product, Work Center, warehouse, Packaging, and units together; the calculation derives this context from the selected work order.

    Manufacturing Date includes date and time. Check both when correcting the production timing. On later confirmation, that date supplies the starting point for the generated time-ticket sequence.

  3. In Production Report, correct Shift, Packaged quantity, or Actual Weight as needed. Actual Weight is entered in pounds, as specified by the form. Read the calculated Quantity with Packaging and Unit of Measure.

    The Quantity beside the work-order details provides manufacturing-order context. Quantity in Production Report is this report's output. For example, if a package contains 20 units and the saved package count was 10 instead of the actual 12, correct Packaged quantity to 12 and check that report Quantity becomes 240 units. Review weight and material information against the actual 12-package run before saving. These are illustrative values.

  4. In Time spent, correct Up Hours for productive time. In Downtime, correct the relevant Down reason, Hours, and Downtime description. Use Log downtime for a missing first event or Log additional downtime for another event.

    Enter hours. Check Up Hours plus the downtime line hours against the shift record. Up Hours must be greater than zero, and the configured hours policy may require the combined total to equal, or stay within, a reporting limit.

  5. In Raw Materials, correct Stock/Lot or Percentage Mix where needed. Check the displayed Lot Number, calculated Quantity, and Unit of Measure against the material actually used. Use Add raw material when another consumed lot was omitted.

    Material Quantity is a calculated display in this update form. Review how the selected lot, actual output weight, mix, and order requirements contribute to it. If the result does not match the consumption being corrected, resolve that basis before saving. Weight-based mix validation follows manufacturing settings and the work center's blending approach; quantity-based consumption uses the order's material requirements instead.

  6. In Report scrap, correct Scrap reason, Scrap quantity, and Scrap description. Use Register scrap for a missing first loss or Add additional scrap for another. Check the resulting Total scrap weight alongside the raw material quantities. Keep scrap separate from the actual usable output weight.

    Where weight-based scrap or downtime is reported, each corresponding line needs a reason code and description. Check the affected rows when a correction changes those totals.

  7. Update Description of work, Comments, or attachments when supporting information needs correction. The attachment area supports uploading or removing files within this form. Check the file names and keep the explanation consistent with the corrected run values.

Review and save the recalculated report​

  1. Compare the recalculated report with the correction you intended. Check report Quantity, Actual Weight, material lots and quantities, Up Hours, Down Hours, scrap, and Over/under together. A package-count correction can change expected weight and its difference from actual output; a time correction can change output rates and labor cost.

    The summary's Total weight shows Actual Weight, while Total scrap weight is separate. Its Actual Output Per Hour card reports weight per hour. Use Production report when interpreting the formulas and cost breakdown.

  2. Choose Update report. The button changes to Updating report while processing. The report is recalculated and validated before the changes are saved. Correct any returned error and review the recalculated values before another submission.

Look for Production Report successfully updated. Then find the same PR number in Production Reports, open View details, and compare the saved values with the correction. Check any material, time, scrap, or attachment information affected by the edit, rather than relying on the success message alone.

For a Draft report that is ready to post, continue with Confirm production report. That guide explains the posting prerequisites and how to check completion.

If the update cannot be saved​

An update checks the report again against its current work context, material stock, and validation settings. A report saved earlier can therefore need a new correction before it passes today's check.

Message or mismatchWhat to check
Update is unavailableCheck the table status. This action is shown for Draft and Confirmed reports. Completed reports have the separate Attach File action.
Production report not foundReturn to Production Reports and locate the PR record again before opening its update form.
Work order, work center, item, variant, warehouse, packaging, or unit cannot be foundCheck the named reference. The work order needs an active work center, and its manufacturing order must supply valid product, packaging, and warehouse context.
Calculated material quantity exceeds the selected lot's stockCheck the corrected output, weight, mix, and selected lot. Correct an inaccurate input or select the lot actually used with sufficient inventory.
Raw materials or mix percentages fail validationCheck the material policy, relevant material lines, and the applicable exact-total or tolerance rule. The blending and consumption approaches affect the calculation.
Scrap or downtime details are incompleteComplete the reason and description on the affected line, including any unfinished additional row.
Up Hours or the combined hour total is rejectedEnter productive time and downtime in hours, avoid counting the same interruption twice, and check the configured total-hours rule.
Weight is zero or Over/under exceeds its limitFor weight-based reporting, compare the package count, actual output weight, product variant weight, and corrected material information. Investigate the difference before changing the values.

FAQ​

Business questions​

Should I update this report or create another one?​

Update the existing PR record when correcting the same run. Create another report when recording different production activity. Identify the saved report by its PR number, work order, product, and shift before making the correction.

Does Update report complete production posting?​

It recalculates, validates, and saves the existing report. Confirmation is the separate task that completes the report and posts the associated time, inventory, and manufacturing-order activity. Use the confirmation guide when a Draft report is ready to post.

Why should I review calculated values when changing only Comments?​

The update recalculates the whole report before saving. Check its quantities, weight, material details, rates, and costs so the saved report still agrees with the run information, even when the intended correction is only an explanation.

Technical questions​

Which report statuses show the Update action?​

The Production Reports table shows Update for Draft and Confirmed reports. It shows the separate Attach File action for Completed reports. Check the row's current status when choosing the appropriate action.

Can I type a corrected raw material Quantity directly in this form?​

Material Quantity is displayed as a calculated value in the update form. Correct the applicable Stock/Lot, Percentage Mix, output, or weight information, then check the result against actual consumption. Resolve a material-basis mismatch before saving.

Why can an update fail when the original report saved successfully?​

Each update recalculates and validates again. Current references, lot stock, material and mix rules, hours, and weight thresholds can affect that check. Use the returned message to identify what needs correction, then review the recalculated report before saving again.