Confirm production report

Confirm a production report when its output, materials, scrap, and time are ready to post. Confirmation completes the report, creates the associated time tickets and stock movements, and records the produced quantity against the manufacturing order.

Before you start​

Find the Draft report in Manufacturing → Operations → Production Reports. The row's confirm action is available for Draft reports.

Check that the report belongs to the work order you performed and that its manufacturing order is In Progress with quantity remaining to produce. The work order needs an active work center. Product, variant, packaging, and warehouse references must still be valid.

Have the shift's package count, actual weight, productive hours, material lots, scrap reasons, and downtime details available. The warehouse needs its stock, production, and quality assurance locations configured. If scrap is reported, check the scrap hold destination as well. A missing location or invalid reference needs correction before the posting can finish.

Confirmation affects connected records. Before submitting, account for these consequences:

  • The report is recalculated and marked Completed.
  • Productive time and each downtime line produce time tickets.
  • Reported material consumption moves stock to production, and reported scrap moves stock to scrap hold.
  • Produced quantity updates the manufacturing order. Reaching its assigned quantity can complete outstanding work orders and the manufacturing order.
  • Finished output moves to stock, or to quality assurance when active production control points apply. In that case, inspections are created for the related quality work.

Complete the review below before posting. Keep any unresolved quantity or material discrepancy with the draft report until it is explained.

Review and confirm the report​

  1. Open the report's row actions and choose confirm. The Confirm production report panel opens with the existing report information.

  2. Match Work order, Date, Product, and Work Center to the production activity. Total Quantity provides manufacturing-order context; it is not the amount this report is about to post. Use the report's Quantity for that comparison.

  3. In Production Report, check Shift and Packaged quantity. Read Packaging, the calculated Quantity, and UoM together. Correct the package count if it does not describe the output actually produced. Review Actual Weight in pounds, as specified by the form.

    The summary's Total weight shows the entered actual weight; Total scrap weight is separate. Check Over/under against the weight difference you expect. The summary's Actual Output Per Hour card is weight per hour, so compare it with a weight-based expectation. See the production report explanation for the calculation distinctions.

  4. In Time spent, check Up Hours against productive time. In Downtime, check each Down reason, Hours, and Downtime description. Use Log downtime for the first missing entry or Log additional downtime for another event. The downtime hours are added together when the report is calculated.

    Up Hours must be greater than zero. The manufacturing hours policy may require productive hours plus downtime to equal a reporting limit, or stay within it. Enter the recorded time accurately; do not change the hours to make an output warning disappear.

  5. In Raw Materials, check every Identified Stock selection against the lot actually used. Review its Quantity and, for weight-based consumption, Percentage Mix. Use add additional item when another consumed lot needs a line. Material requirements and mix tolerance depend on manufacturing settings and the order's consumption approach. Check the calculated consumption after a change, particularly where packaging or weight changes the quantity required.

  6. In Report scrap, check Scrap reason, Scrap quantity, and Scrap description for each loss. Use Register scrap for the first entry or Add additional scrap for another. For weight-based reporting with scrap or downtime, each corresponding line needs its reason code and description. Record a real loss or interruption rather than adding a reason to explain an unrelated calculation difference.

  7. Review Description of work, Comments, and any attachments needed to explain the run. Check the recalculated quantities, weight, scrap, and hours once more. If an output or over/under exception appears, compare the reported values with the work center's capacity and thresholds before continuing.

  8. Choose the panel's confirm button when the report is ready to post. The button changes to confirming while processing. Resolve any returned error, then check the report and connected records before submitting again.

Check the posted result​

Find the same PR report in Production Reports and check that its status is Completed. The confirmation message says Production Report has been confirmed. Use the resulting record status and quantities to verify completion.

Open View details and compare the saved output, raw materials, scrap, and downtime with the values you reviewed. Then check the manufacturing order's completed and remaining quantities. A report can complete part of an order; the order completes when its assigned production is fulfilled.

For example, if an order has 500 units remaining and you confirm a valid report for 200 units, this posting credits 200 units. The order still has 300 units to produce, assuming no other reports or transfers change its balance. If a report exceeds the remaining balance, completion separates normal demand output from overproduction output. The order’s Quantity Completed totals the full quantities of its Completed reports, including the surplus, while remaining demand is floored at zero and excess is recorded separately. Review the output movements as well as those totals. These are illustrative quantities.

When reconciling the posting, use the associated time tickets for productive time and downtime, and the inventory movements for material consumption, scrap, and finished output. If production inspections were created, check their status and the finished output's destination before treating that output as cleared for the next stage.

If confirmation cannot finish​

Use the returned message to locate the failed check. Correct the source of the mismatch, then reopen or review the report and verify the values before another submission.

Message or conditionWhat to check
confirm is missingCheck the report's status. The table shows this action for Draft reports. If the report is already Completed, review its posting results.
Manufacturing order has no quantity remaining, or production cannot be posted to its statusCheck the manufacturing order's current balance and state. Posting requires In Progress. Reconcile other completed reports or transfers before deciding which order the production belongs to.
Up Hours must be greater than zero, or total hours violate the reporting limitCheck Up Hours and each downtime line's Hours against the shift record. Apply the configured maximum or exact-total policy.
Raw materials, mix percentage, scrap reason, or downtime details are rejectedCheck the affected lines and descriptions. Weight-based mix checks use the configured policy; quantity-based consumption follows a different calculation.
Insufficient stock for a material lotVerify the selected lot and calculated quantity. Correct an inaccurate quantity or select the lot actually used with sufficient inventory.
Raw material cost per unit is zeroHave the responsible inventory or costing person correct the stock cost, as the message requests. Then review the recalculated report.
Missing warehouse location, product, variant, packaging, or work centerCorrect the named reference or configuration. If output capacity is the issue, check the product's work center output configuration and compatible unit of measure.

For a late posting error, inspect the report's status and connected time, movement, and order records before retrying. Use the displayed error and the PR number when asking the responsible person to investigate.

Use Production report to interpret quantities, weight, output rates, and costs. Use Manufacturing order to reconcile the overall production commitment, transfers, completed quantity, and remaining balance.

FAQ​

Business questions​

What changes when I confirm a report instead of leaving it in Draft?​

Confirmation completes the report and posts the associated time and stock activity. It creates time tickets, processes consumption and scrap movements, and records the produced quantity against the manufacturing order. Review those inputs before choosing confirm.

Can I confirm production for only part of the manufacturing order?​

Yes. A valid report credits its produced quantity to an In Progress manufacturing order with remaining work. If the report produces less than that balance, production remains outstanding. Check the manufacturing order afterward to see the updated completed and remaining quantities.

Does a Completed report mean the finished output has passed quality inspection?​

Check the related quality work separately. When active production control points apply, completion creates inspections and directs finished output to quality assurance. Review the inspection status and movement destination before treating the output as cleared.

Technical questions​

Why is the confirm action unavailable for my report?​

The Production Reports table shows confirm for Draft reports. Check the current status first. For a Completed report, use View details and its connected records to review the posting.

How should I check the report's hours before confirming?​

Check Up Hours against productive time and sum the Hours on all downtime lines. Up Hours must be greater than zero. Depending on manufacturing settings, their combined total must equal a reporting limit or must not exceed it.

Why does the success message say confirmed while the report shows Completed?​

The action's message says Production Report has been confirmed. Successful completion sets the report to Completed. Verify that state, the saved report quantities, and the manufacturing order's updated balance when checking the result.