Production Report Calendar
Use Production Report Calendar to locate reported production by work center and recorded dates, then open the report to review its output and run context.
Open Manufacturing → Operations → Production Report Calendar. Have the report number, work-order number or production resource ready.
Read the report’s time context
The resource panel identifies Work Center. Each report uses its report number as its name. The displayed span starts at the report’s creation time and ends at its completed date when present. Read these as report-record dates; they do not establish the operation’s actual start and stop times.
Rows also carry output quantity, work-order context and up hours. Read quantity in the product’s output basis, and inspect Details for the manufacturing order, work center, work order and shift.
Status colors distinguish Draft, Confirmed and Completed. The resource-row Status filter applies to work centers, while the colors apply to report status. Use the status and record details together when deciding whether a report still needs review.
Inspect an existing report
- Locate the intended resource and report.
- Choose the report’s Details.
- Compare its report/manufacturing-order numbers, product, center, operation and shift with the run being investigated.
- Check output, packaging, weight and up/down hours in the production-report explanation.
If the calendar span appears unexpected, compare the report’s creation and completion dates with its recorded production values before concluding that an operation ran for the whole span.
Choose the next action
For a new report, the header’s Create production report opens the standard creation task. Use Production Reports for status-dependent updating, confirmation and file attachment.
For planned operation dates, open Production Schedule. For example, a report created after a shift can appear later than the work order’s scheduled slot. Check the underlying records to explain the difference.
FAQ
Business questions
When should I use the report calendar?
Use it to locate a report by resource and recorded dates, then inspect the run’s output and production context through Details.
Does a long calendar span mean the machine ran for that whole period?
No. The span uses report creation and completion dates. Inspect the report’s production values and recorded hours before interpreting machine running time.
Where should I go to plan an operation?
Use Production Schedule for work-order start/end dates. This calendar is for production-report records.
Technical questions
How can I distinguish report status in the view?
Report colors distinguish Draft, Confirmed and Completed. The resource-row Status filter applies to work centers. Check the report’s saved status in Details when deciding its next action.
How can I distinguish reports with similar names?
Open Details and compare report number, manufacturing order, product, work center, work order and shift with the run being reviewed.
Where do I update or confirm a report found here?
Use Production Reports for its status-dependent Update and confirm actions. The calendar provides Details and a Create production report header action.