Move manufacturing quantity

Move manufacturing quantity when all or part of an order's unfinished production needs a separate warehouse or order. Select a destination warehouse and a whole-package count. The amount determines whether the existing order moves in full or a new Draft manufacturing order is created for a split.

Check the order before moving quantity​

Open Manufacturing → Operations → Manufacturing Orders. Identify the order number, item name, and current warehouse. The Move Order action is available for Draft, Open, and In Progress orders.

Check the product, packaging, total quantity, completed output, and any shipped quantity on the linked sales-order line. The destination must be an active warehouse. An order belonging to a subassembly tree cannot be moved or split; this includes a subassembly order and a root order with subassembly orders produced for it.

If a sales order is linked, it must be In Process, and the associated sales-order line must still exist. Related bills of lading must be Scheduled or Awaiting Stock. A shipment that has progressed to another state can block the move.

Review saved work orders, draft reports, material activity, and commercial amounts before deciding which amount to enter. The two outcomes have different consequences:

Your choiceWhat happens when the action succeeds
Move every package to a different warehouse, with no completed or shipped quantityThe same manufacturing order moves to the destination and returns to Draft. All its linked work orders are deleted, and its Draft and Confirmed production reports are deleted. A Completed production report blocks this full move.
Move fewer than the order's total packagesA new Draft manufacturing order is created for the moved amount. The original order's ordered quantity and package count decrease. Its existing production reports stay with it. For an Open or In Progress original, its unfinished work orders are recalculated for the reduced requirement. The destination can be the same warehouse or another active warehouse.

Draft reports do not protect their quantities in the completed-output limit. Reconcile production that has occurred but is still unposted before choosing how much demand to move. A split leaves those drafts on the original order.

For a full move, reconcile existing material activity before submitting. Zero completed output does not establish that no work or consumption has occurred. The deletion of work orders and unposted reports is consequential; check those records and any associated movements before resetting the plan to Draft.

For a split, review the reduced requirement against completed production. If the original order is left with no quantity remaining after reconciliation, its outstanding work orders can complete and the original manufacturing order can become Completed. Review the saved operation quantities and material effects described in Complete work order before choosing such a split.

Work out the package count​

Quantity to move is a count of the displayed Packaging, not the raw unit quantity. It must be a positive whole number. The original ordered quantity must divide evenly by its package count to give whole units per package.

Work out the permitted amount using the current records:

  1. Divide the original ordered quantity by the original package count to find units per package.
  2. Take the larger of completed quantity and the linked sales line's shipped quantity. This is the quantity protected from moving.
  3. Subtract that protected quantity from the original ordered quantity, then divide by units per package to find the maximum packages available to move.

Completed and shipped quantities must each align to a full-package boundary when greater than zero. Do not add those quantities together when calculating the limit; the move uses the larger amount.

For example, assume an order for 1,000 units in 100 packages, with 200 units completed and 100 units shipped. Each package contains 10 units. The protected quantity is 200 units, so at most 800 units, or 80 packages, can move. Entering 30 moves 300 units into a new Draft order. These are illustrative figures.

The original order then has an ordered quantity of 700 units, retains its 200 completed units, and has 500 units remaining, assuming no other transfers or production change its balance. The new order starts with 300 units to produce and zero completed quantity. This split changes the production requirement; check the original's revised percentage against its revised ordered quantity.

Select the destination and submit​

  1. On the correct manufacturing order, choose Move Order. The Move quantity panel opens with the heading Move manufacturing quantity.
  2. Match Product and Manufacturing order number to the source order. Review Total Quantity, Quantity already completed, Packaging, and Unit of Measure. Compare shipped quantity with the linked sales-order line separately when applicable.
  3. Under Move quantity to warehouse, search the warehouse field and select the destination. Choose another warehouse for a full move. Retain the current warehouse only when you intend a partial split into another order there.
  4. Enter the whole-package count in Quantity to move. Check the count against the maximum you calculated and confirm which outcome in the table above it will trigger. There is no separate full-move or split selector.
  5. Complete the linked-record review below, then choose Move quantity. The button shows Moving quantity during processing.

Review linked sales and shipping effects before submission​

When a sales order is linked, a full move changes the associated sales line's warehouse. A split reduces that line and adds a line for the moved quantity at the destination. Freight charges stay on the original sales line; the new split line has zero freight.

Split recalculation uses zero discount amounts on both affected sales lines. Have Sales reconcile agreed discounts, tax, totals, and any invoiced quantity before committing a move involving those amounts. The package limit protects completed and shipped quantities; use the sales record to check invoicing separately.

Related bills of lading can also change. A full move changes the warehouse of a bill containing only the affected line; where other lines share the bill, the affected lines are separated into a bill at the destination. A partial split allocates the moved packages from the latest shipment dates first, creates destination bills for them, and reduces the original bills. Bills left empty are deleted. The affected shipping lines must have valid whole-package quantities matching the manufacturing order's package size.

Check the saved result​

Look for Order successfully moved, then verify the records in Manufacturing Orders.

  • After a full move: find the same order number. Check its destination warehouse, Draft status, Total Quantity, and Packaged quantity. Use View details to review the resulting plan and confirm that the former work orders and unposted reports have been removed. Review the Draft before continuing production.
  • After a split: find the original order and compare its reduced Total Quantity, Packaged quantity, Produced quantity, and Quantity remaining with the intended balance. Locate the newly created Draft using the product, destination warehouse, moved quantity, and Created at information. Check its zero produced quantity and the package count you moved. Review both orders' plans. If the original was Open or In Progress, check its recalculated unfinished operations as well.

For a linked sales order, check both affected sales lines' quantities, warehouses, freight, discounts, and totals. Review the related bills of lading for their warehouse, package quantities, and shipment dates. Check the actual saved records even if a later error appears; this action updates several connected records.

If the move is blocked or interrupted​

Message or conditionWhat to inspect and resolve
Package quantity must be positive or a whole numberEnter a positive whole count of Packaging in Quantity to move.
Invalid packaging configuration, or completed/shipped quantity is not alignedCheck the original ordered quantity, package count, and unit basis. Reconcile production or shipping records to the actual full-package quantities before trying again.
Requested amount exceeds the maximum movableRecalculate the limit using the larger of completed and shipped quantities. Compare the maximum in the message with your package count.
Entire quantity cannot move to the same warehouseChoose a different destination for a full move, or a smaller eligible amount for an intentional split.
Completed production reports prevent the full moveReview the reports and remaining demand. Use only an eligible partial quantity when a split is the intended business change.
Order belongs to a subassembly treeReview the root order identified in the message with the planner. Moving or splitting that tree through this action is unsupported.
Warehouse is missing or cannot be foundSelect a valid active destination. Review its associated work-site setup when the recalculated plan warns about it.
Sales order, linked line, or bill of lading cannot be updatedCheck the named record and current status with Sales or Shipping. The sales order must be In Process; related bills must be Scheduled or Awaiting Stock.
Bill of lading packaging is invalid or does not matchReconcile that bill's unit quantity, package count, and units per package with the manufacturing order.

After an interrupted move, inspect the original order, any new Draft, work orders, reports, sales lines, and bills of lading before submitting again. A second submission could act on quantities or records already changed by the first attempt. Keep the source MO number and returned message when asking the responsible team to investigate.

Use Manufacturing Orders to choose the next supported action. Read Manufacturing order to interpret the revised production balance and costs. Use Update manufacturing order to review supported planning changes while an affected order is Draft.

FAQ​

Business questions​

When does this move the existing order instead of creating another order?​

Moving the entire original package count to another warehouse, with zero completed and shipped quantity and no Completed production reports, moves the existing order and resets it to Draft. An eligible smaller amount creates a new Draft order for that quantity and reduces the original requirement.

What happens to production already reported when I split the order?​

Existing production reports remain on the original order. Its requirement is reduced and its completed output is reconciled there; the new Draft begins with zero completed quantity. Check the original's remaining balance, because moving all its uncompleted demand can complete that order.

Will a move change the sales and shipping plan?​

Yes, when those records are linked. The action updates or splits the sales line and related bills of lading for the destination. A split keeps freight on the original sales line and gives the new line zero freight; recalculated discount amounts are zero. Review both commercial amounts and shipping quantities before and after submission.

Technical questions​

How do I calculate the maximum packages I can move?​

Subtract the larger of completed and shipped unit quantities from the original ordered quantity, then divide by units per package. Enter a positive whole-package count within that limit. Completed and shipped quantities must also align to whole packages.

Can I select the current warehouse as the destination?​

Yes, for a partial split that creates another Draft manufacturing order there. Moving the entire quantity to the same warehouse is rejected because it would not change the destination.

Why can a subassembly order or its root block the move?​

This action does not support moving or splitting a subassembly tree. It rejects an order that belongs to such a tree and a root order that has subassembly orders produced for it. Review the root named in the message with the production planner.