Create manufacturing order
Create a manufacturing order when you need a production plan for a finished item. Choose the product, quantity, production warehouse, material recipe, and routing, then review the calculated requirements and dates. Create order saves the order as Draft for review before confirmation.
You can create an order for a stock requirement or link it to a sales order line. The product identity and packaging must match when a sales order line is linked.
Before you start
Have the finished item, active variant, and packaging available in the product picker. The item needs a valid unit of measure, and the packaging must have a nonzero quantity. Enter a positive production quantity that is a multiple of that packaging size.
Have a bill of material with component lines and a routing with operation steps for the item. When these selections are empty, Naologic looks for active definitions, preferring one scoped to the selected variant, then one covering the item without a variant restriction. Review the selections when several definitions exist.
Choose the warehouse where the work belongs. Naologic finds its associated work site; the form does not ask you to select the site separately. A missing association produces a message directing you to Manufacturing → Configuration → Work Sites.
Enter the production requirement
-
Open Manufacturing → Operations → Manufacturing Orders and choose Create manufacturing order. The Create new manufacturing order form opens on Basics.
-
Choose Product. In Select item, select the finished item with the intended variant and packaging. Complete any product attributes offered by the picker. Check all three parts of the selection before entering the quantity.
-
Set the warehouse, dates, and quantity:
Input What to enter or check warehouse The warehouse serving this production run. Check it before choosing a preferred work center. Order date The date of the manufacturing order. It cannot be after Shipping start date. Shipping start date The shipping date used as the starting point for the production lead-time calculation. This is required even when no sales order is linked. Quantity The amount to manufacture in the item's unit of measure. Enter product units, accounting for the selected packaging size. For example, if an item is measured in pieces and a package contains 12 pieces, enter 240 to manufacture 20 packages. Entering 20 would request 20 pieces and fail the packaging-size check. These figures are illustrative.
-
Review Bill of Materials and Routing. Select the intended definitions if the automatic choices do not describe this run. The selectors offer definitions for the selected item and show their status.
Changing Bill of Materials replaces the order's raw-material lines with the newly selected recipe. Choose the recipe before making order-specific material adjustments. Read Routing steps and operations to check the operations that will be applied.
Review materials, scheduling, and context
In Raw Materials, compare each Raw material, Quantity, Unit of Measure, Packaged quantity, and Packaging. The quantity and packaging columns describe different amounts: material units and the packages needed to supply them.
The BOM's consumption strategy controls how quantities respond to changes. Quantity-based requirements scale with the order quantity. A percentage-based recipe can recalculate material quantity from the finished product's weight and Percentage Mix. For a percentage-and-quantity recipe, the initial selection uses the mix, while later order-quantity changes scale the line quantities. Check the resulting values after every quantity or mix adjustment.
Use Add additional raw material, or Add raw material when the list is empty, for an additional component required by this run. Select its item, variant, and packaging, then review its quantity and unit. The table also allows a line to be removed. Recheck the full recipe after an adjustment, especially before changing the BOM again.
If the plan calls for a particular resource, choose Preferred work center from the centers offered for the selected warehouse. Review the work-center availability messages alongside the routing rather than treating the preference as a confirmed assignment.
Check the calculated Planned start date, Planned end date, and Production Due Date. Planned start is shipping start minus the configured minimum production lead time, with the order date as its earliest possible start. If that lead time would put the start before the order date, Naologic uses the order date and shows a warning. Planned end adds calculated manufacturing time to planned start; production due date follows planned end.
Read the calculation messages for the BOM, routing, total weight, work-center availability, and any warnings or errors. Compare the calculated end with the delivery commitment: the calculated production end can fall after shipping start. Resolve an error or an unsuitable plan before saving.
Use Sales order when this run fulfills a specific sales order line. Choose the line from the available sales orders, then compare its product, variant, packaging, unit, and attributes with Product. Linking a line also supplies the sales order number and account context. Without a linked sales order, you can use Account to retain the intended account context.
For project context, open project information and enter project name, Project description, and Notes as needed. Internal barcode is available on Basics when the run needs that reference.
Save and check the draft
Saving can also create linked Draft subassembly manufacturing orders for manufactured input parts declared by the routing. Those parts qualify when they have an active BOM and active routing; their required quantities follow the parent order's requirement. Account for this additional work before creating the parent order.
- Recheck the product and packaging, positive quantity, warehouse, dates, material lines, and routing. Resolve calculation errors. If you changed Product, check both the BOM and routing again.
- Choose Create order. The button shows Creating order while the request is processed.
- Look for Manufacturing order created, then locate the saved row in Manufacturing Orders. Check its order number, item name, warehouse, and Status. The new order should be Draft.
- Compare Total Quantity and Quantity remaining with the quantity you entered. At creation, the entered quantity becomes the original ordered quantity. Check Packaged quantity, Order date, Shipping start date, and the sales order reference when applicable.
- When subassemblies apply, check their Parent manufacturing order and Root manufacturing order references against the saved order number. Use those references to distinguish the related drafts from separate production commitments.
For the illustrative order of 240 pieces in packages of 12, check Total Quantity of 240 and Packaged quantity of 20. If a quantity-based BOM requires 4 kilograms for 10 pieces, its initial requirement scales to 96 kilograms for 240 pieces. These values assume that recipe and packaging configuration.
If you cannot finish
Use the message to identify whether the correction belongs on this form or in the underlying definition:
| Message or problem | What to check before trying again |
|---|---|
| Select an item, item/variant not found, or packaging does not exist | Reselect the product's active variant and intended packaging. Check the item setup if the required option is missing. |
| Quantity must be greater than zero, or quantity does not align with packaging | Enter a positive multiple of the packaging size. The message provides suggested quantities; check that the chosen amount still meets the production requirement. |
| No BOM or routing found, empty BOM, or no routing nodes | Check the item's definitions. Choose a suitable BOM with component lines and a routing with operation steps; correct the definition before returning if needed. |
| Missing item unit or variant weight unit | Correct the item's unit or the variant's weight unit in Items, then return and check the calculated order again. |
| Order date is after shipping start | Correct the dates so the order date is on or before shipping start. |
| Manufacturing product does not match the linked sales order line | Compare the item, variant, packaging, unit, and attributes. Correct the product selection or select the sales order line intended for this run. |
| Scheduling or calculated-date error | Review the selected warehouse, site setup, routing durations, and work-center availability messages. Correct the relevant plan or setup and check the recalculated dates before saving. |
After a correction, check that the message clears and that the affected quantities or dates now describe the intended run. If creation reports an error, check the order list for the intended item, quantity, and newly created order number before submitting again.
Continue with related work
Use the manufacturing order explanation to interpret the saved quantities, statuses, dates, and connected production work. Review the BOM for the recipe basis and the routing for the operation plan.
FAQ
Business questions
Does Create order start production immediately?
Create order saves a Draft manufacturing order. Review the saved product, quantities, materials, routing, and dates before confirmation.
Can I create an order without a sales order?
Yes. Select the product and complete the production requirement without choosing Sales order. A shipping start date is still required. Link a sales order line when the run needs to fulfill that particular line, and check that its product identity matches.
Will saving the order create subassembly orders?
It can. Manufactured input parts declared by the routing, with both an active BOM and active routing, receive linked Draft manufacturing orders. Check their parent and root manufacturing order references to follow the related work.
Technical questions
Is Quantity a count of packages or product units?
Enter the quantity in the item's unit of measure. Naologic divides it by the selected packaging size to calculate the packaged quantity and requires a positive amount aligned with that size. For example, 240 pieces with 12 pieces per package gives 20 packages.
How are the planned dates calculated?
Planned start is shipping start minus the configured minimum production lead time, bounded by the order date. Planned end adds the calculated manufacturing minutes, and production due date equals planned end. Compare these calculated values with the required delivery timing before saving.
Why did changing the BOM replace my material adjustments?
A different Bill of Materials supplies a fresh set of material lines from that recipe. With the same BOM selected, the order keeps its lines; quantity changes and the BOM's consumption strategy can still recalculate amounts. Choose the intended BOM before making adjustments, then recheck the resulting quantities.