Manufacturing Orders

Manufacturing Orders tracks what product is to be made, the planned amount, production progress and the associated material and operation plan. Use it to prepare production demand, inspect its results, and choose the appropriate follow-up.

Open Manufacturing → Operations → Manufacturing Orders.

Establish the demand and readiness​

Match order number, item name, warehouse, and any Sales order and Account context. Use View details to inspect the product/variant, package basis, bill of material, routing and planned dates before acting.

A new order needs an existing product/variant, suitable warehouse, bill of material and routing. Read Create manufacturing order for the supported choices and calculations. Check the resulting Draft and planned requirements before progressing it.

Update is shown for Draft. Review changes carefully because the material and subassembly plan can change when the order is recalculated. Read the manufacturing-order record to understand the plan and its connections.

Review production progress​

Read Total Quantity, Produced quantity, Quantity remaining, and Overproduction separately. Produced quantity is compared with the recorded ordered amount; remaining quantity also accounts for transferred demand.

For example, an illustrative order of 1,000 units with 300 completed and 200 transferred has 500 remaining. A remaining balance is not a reason to count the transferred amount as completed output.

Follow operations in Work Orders and Production Schedule. Use Production Reports to create and check reports of actual production. Compare report and operation context with the parent order before interpreting progress.

Choose the supported exception​

SituationDecision and checkpoint
Planned demand needs adjustment while still DraftUpdate manufacturing order and compare the saved product, amount, dates, materials and subassembly plan.
Remaining demand belongs elsewhereMove manufacturing quantity after checking package limits and destination. A full move resets the order to Draft and deletes linked work orders and unposted reports; review those effects before submitting. A partial move creates a Draft split. Verify affected production, sales and shipping records afterward.
In-progress production will end before the original targetEnd the order early only after checking reports, operation actuals and the reason for stopping.
Already reported output is attributed to the wrong eligible orderReview Production Transfer; this differs from moving remaining demand.

The list shows confirm for Draft, Move Order for Draft/Open/In Progress, and End Order Early for Open/In Progress. The early-finalization action requires In Progress when executed. Always check the current record and action result.

After a change, reopen View details, compare the saved status and amounts, and inspect connected work before repeating an interrupted action. Report confirmation can affect costs, material movements and inspection context; overall release and inventory checks remain separate connected work.

FAQ​

Business questions​

How do I identify the production demand I am about to change?​

Match order number, item, warehouse and any sales-order/account context, then inspect the product variant, package basis, materials and routing in View details.

How does a work order differ from a manufacturing order?​

The manufacturing order describes the production demand and plan. Work orders describe assigned operations used to carry out that production.

When is Production Transfer different from Move Order?​

Production Transfer reassigns eligible completed production reports between orders. Move Order concerns manufacturing demand; check the intended business change before choosing an action.

Technical questions​

How should I interpret remaining quantity?​

It is the recorded ordered quantity less transferred and completed quantities, floored at zero. A partial Move Order reduces the ordered baseline on the original. Keep excess output in the separate overproduction value.

When does the list show Update?​

Update is shown for Draft. Compare the saved amounts, material requirements and subassembly plan after making a change.

Does a visible End Order Early action mean an Open order can be finalized?​

No. Although the list shows it for Open and In Progress, the finalization action requires In Progress. Check the current state and resolve the reported condition.