Update work shift
Update the existing work shift when its stored details need correction.
Open Manufacturing → Configuration → Work Shifts.
Before you start
Prepare a shift name, warehouse, description, and weekday start/end hours. Have the tracing barcode component code ready if you use it.
Prepare the values
- Name, Description, and warehouse identify the working pattern and its warehouse context.
- For each Workday, enter Start hour and End hour in 24-hour time. For example, 8 and 16 describe 08:00–16:00; these are illustrative values.
- Barcode component code identifies the shift in tracing barcodes. Keep it separate from the working hours.
Update work shift
- Find the existing work shift and choose its Update action. Check its current name and warehouse before changing values.
- Set Name, warehouse, and Description. Add or review the Workday rows, checking each Start hour and End hour. Review Barcode component code if you use it.
- Compare the values with your intended working pattern before choosing Update shift.
Check the result
Reopen the shift and compare its warehouse and every weekday row with the operating pattern you intended. Check start and end hours individually; the name alone does not establish the hours. Use Update to correct a saved value, then repeat the comparison.
Read the work shift record for its meaning and connected work.
FAQ
Business questions
When should I use this task?
Use it to correct the stored details or weekday operating hours of an existing shift.
Why check the warehouse before saving?
The warehouse is part of the shift record. Check it so that the working pattern is associated with the intended warehouse context.
Is the shift name enough to describe availability?
No. The weekday rows hold the actual start and end hours. Review those rows even when the name already looks right.
Technical questions
How should I enter the hours?
Use 24-hour start and end values. An illustrative 08:00–16:00 day uses start 8 and end 16.
Where do I specify the days worked?
Use the Workday rows. Each row has its own weekday, Start hour, and End hour.
What does Barcode component code control?
It contributes the shift identifier to tracing barcodes. Enter the working hours in their own weekday rows.