Update work instruction

Correct the existing production procedure.

Open Manufacturing → Configuration → Work Instructions.

Before you start​

Prepare the procedure title, internal reference, time estimate, written directions, and supporting files.

Prepare the definition​

Set Instruction title to the job and Internal reference to the identifier you use for the procedure. Enter Estimate duration minutes in minutes, then write the procedure in Step-by-step operation instructions. Use attachments for the supporting files that belong with those directions.

Update work instruction​

  1. Find the existing record and choose Update. Check its current name or reference before changing it.
  2. Review the title, internal reference, and estimated minutes. Enter or revise the step-by-step directions, then review the supporting files under attachments.
  3. Compare the definition with the intended procedure and choose Update instruction.

Check the result​

Open the saved instruction through its Instruction details action. Compare the written directions and supporting files with the procedure you intended to provide. If its text or estimate needs correction, use Update, save the correction, and read it again.

Read the work instruction record for the meaning of the stored information.

FAQ​

Business questions​

When should I use this task?​

Use it to correct an existing procedure, estimate, or supporting files.

Does saving an instruction create a work order?​

Saving stores the instruction definition. Work orders are separate records that can reference an instruction.

Why keep supporting files with the written directions?​

The attachment gives supporting material alongside the procedure, so that you can read the directions and the relevant file together.

Technical questions​

How do title and internal reference differ?​

Instruction title describes the job. Internal reference identifies the procedure using your own conventions; check both before changing similarly titled instructions.

Which unit does the duration estimate use?​

Estimate duration minutes is measured in minutes. It is an estimate, rather than logged actual time.

How do I verify the saved content?​

Choose Instruction details on the saved record. Compare the written procedure and supporting files with what you intended; use Update to correct the stored content.