Use Work Centers to define the production resources that host operations, compare their capacity, and record dated interruptions.

Open Manufacturing → Configuration → Work Centers.

Establish the resource and production context​

Create work center for a separate production resource. Update work center to correct its standing settings. Read the name/code with the site, warehouse, and functional type before comparing resources.

Compare capacity and time on the right basis​

Daily available hours describes time availability. Item output rows describe output per hour for a particular product, variant/attribute scope, and unit. Minimum run quantities answer a different question from hourly output. Setup, cleanup, and changeover standards use minutes and add context to the production-time comparison.

Read the work-center record before interpreting its cost rates, blending mode, warning/error levels, and state. Use like-for-like products and units when comparing alternatives.

Record an interruption​

Log downtime creates a maintenance work order for the selected period. Check end after start, the permitted UTC-day date range, and any overlapping work orders before saving. It records the maintenance reservation; check the resulting work order’s center, interval, reason, and Maintenance state.

Check the result before continuing​

After a configuration change, reopen the record and compare the stored values. After an outage entry, inspect the maintenance work order. Keep those two results separate when reviewing the production plan.

FAQ​

Business questions​

When should I create or update a work center?​

Create a separate record for another production resource. Update the existing record to correct its identifying details, capacity, time standards, rates, or reporting settings.

How do site and work center type differ?​

Work site identifies the production facility. Work Center Type classifies the resource by function. Check both alongside the individual center’s name and code.

Should I use setup editing to record a dated outage?​

Use Log downtime for a dated interruption. It creates a maintenance work order; the configuration form defines the center’s standing settings.

Technical questions​

Which time units should I compare?​

Available hours per day uses hours. Default setup, cleanup, and changeover values use minutes.

How should I read an output-capacity row?​

Read item, Product/variant filters, Attributes, Output per hour, and Unit of Measure together. A rate for one product/unit is a different assumption from another.

How do I verify the saved settings?​

Reopen Update on the intended name/code. Compare location/type, daily hours, capacity rows and units, timing standards, rates, blending mode, and reporting thresholds with your intended definition.