Work Centers
Use Work Centers to define the production resources that host operations, compare their capacity, and record dated interruptions.
Open Manufacturing → Configuration → Work Centers.
Establish the resource and production context
Create work center for a separate production resource. Update work center to correct its standing settings. Read the name/code with the site, warehouse, and functional type before comparing resources.
Compare capacity and time on the right basis
Daily available hours describes time availability. Item output rows describe output per hour for a particular product, variant/attribute scope, and unit. Minimum run quantities answer a different question from hourly output. Setup, cleanup, and changeover standards use minutes and add context to the production-time comparison.
Read the work-center record before interpreting its cost rates, blending mode, warning/error levels, and state. Use like-for-like products and units when comparing alternatives.
Record an interruption
Log downtime creates a maintenance work order for the selected period. Check end after start, the permitted UTC-day date range, and any overlapping work orders before saving. It records the maintenance reservation; check the resulting work order’s center, interval, reason, and Maintenance state.
Check the result before continuing
After a configuration change, reopen the record and compare the stored values. After an outage entry, inspect the maintenance work order. Keep those two results separate when reviewing the production plan.
FAQ
Business questions
When should I create or update a work center?
Create a separate record for another production resource. Update the existing record to correct its identifying details, capacity, time standards, rates, or reporting settings.
How do site and work center type differ?
Work site identifies the production facility. Work Center Type classifies the resource by function. Check both alongside the individual center’s name and code.
Should I use setup editing to record a dated outage?
Use Log downtime for a dated interruption. It creates a maintenance work order; the configuration form defines the center’s standing settings.
Technical questions
Which time units should I compare?
Available hours per day uses hours. Default setup, cleanup, and changeover values use minutes.
How should I read an output-capacity row?
Read item, Product/variant filters, Attributes, Output per hour, and Unit of Measure together. A rate for one product/unit is a different assumption from another.
How do I verify the saved settings?
Reopen Update on the intended name/code. Compare location/type, daily hours, capacity rows and units, timing standards, rates, blending mode, and reporting thresholds with your intended definition.