Skip to main content

Work Center Types

A work center type groups production resources by function. Read it to understand the kind of operation a work center represents, rather than the identity of an individual machine.

Open Manufacturing → Configuration → Work Center Types.

Choose the appropriate change​

Create a work center type when you need a separate definition. Update the existing definition when its stored content needs correction. Compare the current type name and description before creating another record.

Check the definition before using it​

Use Type name for the function you are classifying and Description for its production role. Review the Operation type rows and Skill rows separately; a function and the skills associated with it answer different questions.

Reopen the type and compare its name, description, operation types, and skills with your intended classification. If a saved row is wrong, use Update to correct that definition, then check the lists again.

Read the classification explanation to understand where it connects to production work.

FAQ​

Business questions​

How does a type differ from a work center?​

A type is a functional classification. A work center is the individual production resource assigned to a type.

Where can this classification matter?​

Work centers, routing nodes, and manufacturing/BOM operation lines reference it. Compare those references when tracing a production step.

When should I revise an existing type?​

Revise its definition when its name, purpose, operation types, or associated skills no longer describe the intended classification.

Technical questions​

What should I read together?​

Read Type name and Description first, then the Operation type and Skill rows to understand the full classification.

Are operation types and skills the same list?​

No. They are separate repeating groups in the work center type definition.

Which record states are listed?​

Draft, Active, and Inactive are listed. That list alone does not determine which change is appropriate for your production resource.