Bill of material

A bill of material (BOM) defines the components and quantities needed to manufacture a finished item. Read the finished-item identity, recipe quantity, and raw-material lines together before using it as a production plan.

Read the recipe basis​

Name and Description identify the recipe. item identifies the finished product, and Variant limits the product configuration represented by the definition. Quantity of items manufactured provides the finished-output basis for comparing the component quantities.

For a manual check, a recipe requiring 20 kilograms of material for 10 finished units implies 2 kilograms per finished unit. These are illustrative values. Keep the component unit visible; a count of finished pieces is not a weight unit.

Interpret the component lines​

Each line identifies Raw material, Quantity, Percentage Mix, and Unit of Measure. Compare item/variant identity and units as well as the numbers. The Quantity consumption strategy identifies whether the definition is expressed using quantity, percentage, or percentage and quantity; review the resulting line values after choosing it.

The choice is carried into manufacturing-order material calculations. Use it to distinguish a mass formulation from counted component requirements:

ChoiceWhen it fits and what the order calculation does
Calculate By PercentageA mass-based formulation: a positive mix percentage derives the line quantity from the order quantity and finished-good unit weight. Changing the mix reformulates the line.
Calculate By Percentage And QuantityStarts from the mass formulation when the BOM is selected, then scales the established component proportions when the manufacturing quantity changes. The mix becomes a readout of that quantity split.
Calculate By QuantityCounted component requirements: the component-to-finished-unit ratio scales with the manufacturing quantity. Weight is informational for this strategy.

These describe the manufacturing-order calculation using the saved definition. Check the resulting quantities on that order; selecting the BOM strategy is not itself a stock-consumption action.

The component calculator resolves variant metadata and standard cost. It rounds planned unit cost to five decimal places, then multiplies that cost by the line quantity. For example, 8 units at a standard cost of 1.25 give a line planned cost of 10.00. This is an illustrative line-cost check, not a product default or an overall order-cost calculation.

Missing variants and zero/invalid costs produce line messages. Check the component's variant and standard cost before relying on its planned amount.

Follow the manufacturing context​

Manufacturing orders reference the BOM. Its component requirements describe planned material, while actual consumption belongs to production work. Where operation lines are present, read their work-center context, duration, and planned cost separately from material quantities.

The catalog lists Draft, Active, Archived, and Inactive. Read the actual record state when selecting a definition; those labels alone are not a transition procedure.

Maintain the definition​

Open Manufacturing → Planning & Definition → Bill of Materials (BOM). Create a BOM for another recipe, or update it to correct the stored definition.

FAQ​

Business questions​

What does a bill of material describe?​

It defines the components and quantities for producing a finished item. Read the finished item and recipe quantity alongside the component lines.

How does it differ from a routing?​

The BOM describes material requirements. A routing describes production operations. Manufacturing orders can refer to both definitions.

Why check the finished-item variant before using a BOM?​

The BOM has finished-item and variant references. Check that those match the product configuration whose material requirements you need.

Technical questions​

How should I compare the recipe quantity and component quantities?​

Use the finished recipe quantity as the comparison basis. For example, 20 kilograms for 10 finished units is 2 kilograms per unit as a manual reasonableness check; these are illustrative values.

Where does a component’s planned cost come from?​

The calculator takes the component variant’s standard unit cost, rounds it to five decimal places, and multiplies it by the component quantity for line planned cost.

What should I check when a component line has a cost or variant error?​

Verify that the selected variant exists and has a finite, nonzero standard cost. Correct its item/variant setup, then recheck the line before using the BOM.