Manufacturing
Manufacturing connects production demand with material definitions, assigned operations, production reports and the resources that carry out the work. Start with the business question: what must be made, how it should be produced, where the operation is planned, or what actually happened.
Know the main records
| Record | Business role |
|---|---|
| Manufacturing order | Product demand, planned quantity, material and operation plan, and overall progress. |
| Work order | A production operation with its assigned resource, requirements, dates, time and costs. |
| Production report | Reported output and production time/weight context for a run. |
| Bill of material and routing | Material definition and the operation strategy used in planning. |
| Work center, work site and work shift | Production resource, facility context and shift definition. |
| Time ticket | A recorded interval of production time and its cost context. |
Before preparing an order, establish the product/variant, warehouse and unit/package basis, then check its bill of material and routing. Production resources need the correct site/type, availability and relevant capacity/rate settings. A named resource alone does not establish material readiness.
Choose where to begin
| Your situation | Start here |
|---|---|
| Prepare demand or inspect produced/remaining amounts | Manufacturing Orders. |
| Review resource assignments and planned dates | Production Schedule or Work Orders. |
| Record output or review a run before confirming it | Production Reports. |
| Find a report by resource and recorded dates | Production Report Calendar. |
| Decide how affected goods leave rework | Rework Orders. |
| Define the material recipe or operation strategy | Bill of Materials or Routings. |
| Prepare resources or review a dated interruption | Work Centers and its downtime task. |
| Review a report-attribution correction | Production Transfer. |
Follow plan and actual results together
An order establishes the planned product and demand. Operations place work at resources and dates. Production reports capture output and production context; their confirmation has connected material, time and inspection effects. Check each record’s saved result before treating the next stage as ready.
For example, a planned 1,000-unit order and a 300-unit completed report answer different questions. The order explains demand and remaining progress; the report explains the run that contributed output. Inspect the linked operation, center and shift before comparing time or cost.
Use Settings to interpret the configured mix-validation, output-level and consumption choices. Their scope matters: process-percentage calculations and quantity-based calculations do not use all policies in the same way.
Handle connected work at its source
Rework completion and scrap dispositions have different stock and replacement-demand effects. Scrap regrind records declared recovered material and its calculation basis. Tool models describe tooling specifications, while tool assets identify physical copies.
Inventory manages stock and Cycle Counts; Quality Control handles inspection and release decisions; Shopfloor provides execution context for shared work orders, time tickets, centers and shifts. Use those areas for their work after checking Manufacturing’s saved quantities and references. A completed operation or report does not by itself establish every inventory or quality-release result.
FAQ
Business questions
Where should I start when preparing new production?
Start with Manufacturing Orders after checking the product/variant, warehouse, unit/package basis, bill of material and routing. Verify the resulting Draft and planned requirements.
Which record explains an operation and which explains reported output?
A work order explains the assigned operation and its requirements, dates, time and costs. A production report explains reported output and production context for a run.
How should I hand work to Inventory or Quality Control?
Check the saved Manufacturing quantities, status and references, then use the receiving area for its stock, inspection or release work. Manufacturing completion alone does not establish every receiving result.
Technical questions
Where do I compare planned dates with recorded report dates?
Production Schedule uses work-order start/end dates. Production Report Calendar uses report creation and completion dates. Open the underlying records to explain differences.
Which resource record should I check for production capacity and rates?
Check Work center for the production resource, its capacity/rate context and availability, alongside its site/type and relevant outage periods.
Why does calculation method matter when reviewing results?
The bill of material’s strategy distinguishes process-percentage and counted-quantity planning. Material and output checks must use the applicable strategy, product units and package basis.