Reserved Stock
Use Inventory → Stock Operations → Reserved Stock when you need to understand which demand a quantity has been set aside for. A reservation connects an item and lot with the sales or manufacturing work it supports. Read that commitment alongside its consumption before making a delivery decision.
Find the commitment you need
Search the table, then check item, Lot Number, and the order references together. Two rows for the same item can support different orders or lots. The item name alone does not identify the commitment you are investigating.
Use Sales order to trace customer demand and Manufacturing order to identify associated production. Reservation Type distinguishes Made to stock, Make to order, and Account reservations. The references give you context for the commitment; they are not evidence that shipment or production has finished.
Compare the quantities on the same basis
Read the quantity columns in pairs:
| Compare | What it tells you |
|---|---|
| Quantity reserved and Quantity consumed | The original reserved quantity and the amount already consumed by the work it supports. |
| Packaged quantity reserved and Packaged quantity consumed | The same concerns expressed in packaging quantities. Use matching packaging when comparing these values. |
Do not subtract a packaged quantity from an item quantity. For the remaining item quantity, subtract Quantity consumed from Quantity reserved. For example, 100 units reserved minus 30 consumed leaves 70 units of demand. A reserved amount is a commitment; a consumed amount records use of that commitment.
The commitment can exist before stock physically fills its reserved lot. Check the lot's actual on-hand quantity before treating the remaining demand as goods ready for delivery. Read Reserved stock for the distinction between remaining demand, the quantity needed to fill the lot, and allocation timing.
Check status and timing before a handoff
Read Status, Promised Date, and Allocation mode with the order references. The status choices include Draft, Confirmed, Completed, and Released. A Draft reservation is a created request; Completed describes a depleted reservation. A row's status does not replace the checks on the relevant order or shipment.
Allocation mode distinguishes Immediate from Days before promised date. The latter uses the reservation's lead days and promised date to describe its allocation timing. Investigate that timing when a commitment exists but the allocation you expect is not yet present. Do not treat a future commitment as a completed physical stock movement.
When the quantities do not match the work you are checking, first confirm the item, lot, order, and quantity basis. Carry those references and the reserved and consumed values into the order review. This screen is useful for identifying the reservation involved before investigating the originating work.
FAQ
Business questions
When should I use Reserved Stock?
Use it to review quantities committed to a particular demand and see how much of each reservation has been consumed. Start with the item, lot, and order references.
Does a reservation mean the customer has received the goods?
No. The reservation records a commitment for demand and may exist before its lot is physically filled. Check the lot's on-hand stock, then the corresponding order and shipment for delivery progress.
How do I tell which work a reservation supports?
Read Sales order, Manufacturing order, and Reservation Type together. The type distinguishes Made to stock, Make to order, and Account commitments.
Technical questions
Which columns should I compare when checking consumption?
Compare Quantity reserved with Quantity consumed. If you are working in packs, compare the two packaged quantity columns instead. Keep both values on the same quantity basis.
Why should I check the lot as well as the item?
The reservation includes a lot number as well as an item. Match Lot Number and the order reference so that you review the intended commitment rather than another reservation for the same item.
Which timing information helps explain an allocation?
Check Allocation mode and Promised Date. The available modes are Immediate and Days before promised date; the second uses allocation lead days on the reservation.