Scrap order
An Inventory scrap order records stock selected to move from a warehouse's stock location to its scrap location. Use it to check which stock, quantity, and cost belong to a write-off and to trace the resulting movement.
Open Inventory → Scrap → Scrap Orders. Read Scrap Order, warehouse, Status, Scrap Date, Posting date, and Scrap note together. The order number begins with SC and identifies this event.
Identify the source stock
Each line refers to a stock record and carries its product, variant, packaging, unit, and lot information. Compare that source stock with the warehouse before deciding which quantity is being scrapped.
The warehouse must be active and have a stock location for calculation. Completion also requires its scrap location and valid source stock with a general-ledger account. Review the Warehouse when a required operating location is missing.
Inventory scrap orders and Manufacturing's scrap recovery work serve different purposes. This order describes a stock-to-scrap write-off. It does not itself describe converting material by weight into a recovered product.
Read quantity and value together
Quantity is the amount selected for scrapping in the source stock's item unit. Available quantity comes from that selected stock record; compare the exact variant, package, unit, lot, and cost layer.
Calculation reports when requested quantity exceeds available quantity and reduces it to that available amount. Check the calculated result rather than assuming your original entry was retained. Use a positive quantity that matches the intended write-off.
Cost per unit is copied from the source stock. The line value is:
Line total = quantity to scrap × cost per unit, rounded to five decimal places.
For an illustrative line of 8 units at 2.50, the value is 20.00. If the source has 30 available units, compare the intended 8-unit write-off with that source and review the resulting movement before accepting a remaining balance of 22. This example assumes no other stock activity.
Distinguish dates and state
Scrap Date describes the scrapping event. Posting date supplies the resulting movement's accounting date. Creation and update dates describe record maintenance and are separate from those business dates.
Draft is the state eligible for completion. The completion action builds a movement from warehouse stock to scrap using the saved line quantities and costs, requests its completion, and marks the order Completed.
Check the movement independently. A Completed order alone does not establish that the expected stock and financial results are present. Review the current source quantity before acting, particularly if the draft has been waiting while other stock operations occurred.
Trace the result before closing the investigation
Find the movement that refers to the Scrap Order number. Compare its source stock location, scrap destination, item configuration, lot, actual quantity, cost, and signed Movement History entries.
For stock identified by a lot or serial, have the inventory lead verify the source identity and movement result before proceeding with scrapping. Retain the original stock and order references when investigating any mismatch or arranging a correction.
If the order or movement result is uncertain, inspect existing history before attempting another action. The source stock, scrap order, movement, and any financial posting are separate checkpoints.
FAQ
Business questions
What does an Inventory scrap order represent?
It records stock selected for a write-off from warehouse stock into the warehouse's scrap location, with quantity, cost, and reason context.
Is this the same as scrap recovery in Manufacturing?
No. This order describes the stock-to-scrap write-off. Manufacturing recovery is separate work for converting material into a recovered product.
Does Completed alone prove the write-off was posted correctly?
No. Check the corresponding movement and signed history, including the source identity, quantities, locations, and costs. Verify financial results separately where required.
Technical questions
How is the line value calculated?
Multiply the quantity to scrap by the source stock's cost per unit and round to five decimals. Eight units at 2.50 gives 20.00.
Why might the calculated quantity be lower than the requested amount?
Calculation compares the request with the selected stock's available quantity. A request above availability is reported and reduced to that available amount; review the returned quantity.
Which date supplies the movement accounting date?
Posting date supplies it. Read Scrap Date as the event date and creation or update dates as record-maintenance information.