Movement

A movement records a planned transfer of items from a source location to a destination location. Use it to understand what should move, what quantity is being completed, and which business transaction the transfer supports. Open the record from Inventory → Stock Operations → Stock Movements.

The movement brings the transfer together under one movement number. Completion creates the stock entries that record the quantity leaving the source and arriving at the destination. Read those entries when you need to reconcile the transfer with current stock.

Read the transfer's purpose and locations​

Start with the movement number, operation type, warehouse, and source and destination locations. The locations tell you where each side of the quantity change belongs.

Receipt identifies incoming goods, Delivery identifies outbound goods, and Internal identifies an internal transfer. Other operation types identify manufacturing, scrap, inspection, regrind, and adjustment work. Read the source document alongside the operation type to establish why the movement exists. The type alone does not describe the progress of every connected business process.

A purchase order or goods receipt reference gives receiving context. A sales order or shipping document reference gives fulfilment context. Manufacturing order and production report references connect the movement to production. Use the reference that is present on the record to trace the work involved.

Read dates according to their purpose: the scheduled date describes the planned start, the deadline describes the target, and the completion date records when the movement was completed.

Check each item's quantities and cost​

Each movement line identifies the product, variant, packaging, unit of measure, and any attributes or lot numbers involved. Read these together before comparing quantities. Two lines with the same product name can concern different variants, packs, or lots.

Demand Quantity is the amount requested. Actual Quantity is the amount used for stock posting at completion. Every line being completed must have an actual quantity greater than zero and no greater than its demand quantity. If the actual amount is lower, check that the remaining business demand is understood before completing the transfer.

A source lot number identifies the existing lot being drawn from. A destination lot number identifies the lot receiving the quantity; completion can create its lot record if that number is new. Keep the two roles distinct when tracing a change in lot identity.

The movement calculation uses these totals:

ValueHow to interpret it
Line total costActual quantity × line cost per unit, to five decimal places.
Total demand quantitySum of the lines' demand quantities. Compare quantities with compatible units.
Total productsNumber of movement lines, including repeated products on separate lines.
Total costSum of the calculated line total costs.
Header cost per unitCalculated total cost ÷ total demand quantity, to five decimal places.

The header cost per unit uses demand as its denominator. It can differ from a line's unit cost when actual quantity differs from demand. It is a movement summary, so use the line cost when checking an individual product.

Example: compare a partial quantity with the posting​

Suppose an internal movement has one line with demand of 10 units, actual quantity of 8, and unit cost of 3.00 in one currency. Assume the source holds 100 units and the destination holds 20, with no other stock activity.

The calculated line total is 8 × 3.00 = 24.00. The header cost per unit is 24.00 ÷ 10 = 2.40. The line's unit cost remains 3.00.

Completion posts −8 units at the source and +8 at the destination. The resulting on-hand quantities are 92 and 28. Their combined quantity remains 120. The corresponding stock-entry costs are −24.00 and +24.00.

These numbers are illustrative. When actual quantities change during completion, reconcile the posted entries in Movement History rather than relying on a header summary alone.

Interpret status before acting​

Draft, Confirmed, and Completed are the movement's status choices. The Create movement action creates a Confirmed record. Confirmed means the movement is waiting to be completed; creation alone does not post its stock entries.

Completion accepts a Confirmed movement with at least one line and a movement number. It posts the actual quantities, recalculates the affected stock positions, and marks the movement Completed with a completion date. A completed movement is no longer accepted by that completion action.

Before completing, check the product dimensions, unit of measure, packaging, source and destination locations, lots, actual quantities, and unit costs. The movement calculation reports missing product information and invalid or zero unit costs.

An Insufficient stock error can occur when posting would make a warehouse stock-location balance negative under the configured negative-stock policy. Use the product and location named in the error, then check the intended lot and cost layer. Stock elsewhere, or in a different lot or cost layer, may not satisfy that posting.

Read the posted stock movement detail​

Stock movement entries are the posted detail belonging to the parent movement. Each completed line creates two entries: a negative source entry and a positive destination entry. Both carry the movement reference and completion time, with the product, location, lot, cost, weight, and account context needed to trace them.

For a transfer, compare both entries before interpreting a negative quantity as a loss. An entry records a change at one location; it is not that location's current stock balance. Use Movement History to investigate the posted entries.

Check demand and accounting separately​

Movements can also update a matching reservation. For example, delivery from a reserved made-to-stock or make-to-order lot consumes up to the reservation's remaining quantity. A movement into a reserved lot can record produced quantity under the applicable reservation type. Use the item, lot, location, and source order together when reviewing Reserved Stock.

The Posting rule distinguishes Allowed to post from Not allowed to post for general-ledger posting. Read the source and destination account context with that rule when investigating value. When financial posting is expected, confirm the resulting journal entry separately during an accounting review. A completed stock movement and a recorded account reference do not by themselves complete that review.

FAQ​

Business questions​

Does a Confirmed movement mean the stock has moved?​

No. Confirmed means the movement is waiting to be completed. Completion posts its source and destination stock entries and recalculates the affected stock positions.

How do Receipt, Delivery, and Internal movements differ?​

Receipt describes incoming goods, Delivery describes outbound goods, and Internal describes an internal transfer. Read the source document and both locations with the operation type to understand the business purpose.

Does Completed mean the accounting review is finished?​

No. Completed records the stock movement's completion. Check the posting rule and, when financial posting is expected, the resulting journal entry separately when confirming its financial treatment.

Technical questions​

Which actual quantities can be completed?​

Each line's actual quantity must be greater than zero and no greater than its demand quantity. Completion also requires a Confirmed movement with a movement number and at least one line.

Why does one line create two stock movement entries?​

The entries record both sides of the transfer: the actual quantity leaves the source as a negative entry and arrives at the destination as a positive entry. Match the movement reference, item, and locations when reconciling them.

Why can the header cost per unit differ from the line cost per unit?​

The header divides total calculated line cost by total demand quantity. A line uses its actual quantity to calculate cost, so a difference between actual and demand can change that header summary. In the example above, 24.00 ÷ 10 gives 2.40 while the line unit cost remains 3.00.